<br />County is willing to work with communities to incorporate such features, or similar screening
<br />devices(fcncing) into the plan -- where the Connnunity is in a position to fund the wall/feahrre.
<br />
<br />4.3 PROJECT FUNDING
<br />
<br />The total estimated cost to reconstruct this segment of Lexington A venue, including right of way and
<br />engineering, is $J.5M. The final cost will be determined as project design proceeds. Project funding
<br />will be finalized through the State and local approval process. The following is an estimate of
<br />construction costs:
<br />
<br /> 241,000.00 62,275.00 2,000.00
<br /> Storm Sewer 179,080.00 179,080.00 I
<br /> Ponds 7,405.00 7,405.00
<br /> Curb and Gutter 127,915.00 82,979.00 22,468.00 22,468.00
<br /> Concrete Sidewalk 60,100.00 15,025.00 45,075.00
<br /> Median Sidewalk 75,135.00 18,783.75 28,175.63 28,175.63
<br />. :Bituminous Path 31,000.00 31,000.00
<br />Structural Walls 225,000.00 225,000.00
<br /> Modular Wails 76,600.00 19,150.00 21,831.00 35,619.00
<br /> Fencin[L 8,750.00 8,750.00
<br /> Traffic Control 20,000.00 17,200.00 1,400.00 1,400.00
<br /> 10,000.00 10,000.00
<br /> Water Main 100,000.00 ~100,000.00
<br /> Mobiiization 80,000.00 68,800.00 5,600.00 5,600.00
<br /> Total Const.Cost 2,668,364.00 2,286,276.75 186,824.63 __~~,26262
<br /> 640,407.36 548,706.42 ! 44,837.91 46,863.03
<br /> 78,000.00 113,000.00
<br />
<br />
<br />
<br />
<br />
<br />Subject to available f1.mding and required approvals, a contract is scheduled to be let in tbe spring of
<br />2005 and provide for completion ofa11 construction activities by Dccember 1,2005.
<br />
<br />Ramsey County's policy seeks to gain approval of design concepts by municipalities before significant
<br />completion of final plans and specifications. The signature of approval signifies that lhe municipalities