Laserfiche WebLink
<br />. <br /> <br />County is willing to work with communities to incorporate such features, or similar screening <br />devices(fcncing) into the plan -- where the Connnunity is in a position to fund the wall/feahrre. <br /> <br />4.3 PROJECT FUNDING <br /> <br />The total estimated cost to reconstruct this segment of Lexington A venue, including right of way and <br />engineering, is $J.5M. The final cost will be determined as project design proceeds. Project funding <br />will be finalized through the State and local approval process. The following is an estimate of <br />construction costs: <br /> <br /> 241,000.00 62,275.00 2,000.00 <br /> Storm Sewer 179,080.00 179,080.00 I <br /> Ponds 7,405.00 7,405.00 <br /> Curb and Gutter 127,915.00 82,979.00 22,468.00 22,468.00 <br /> Concrete Sidewalk 60,100.00 15,025.00 45,075.00 <br /> Median Sidewalk 75,135.00 18,783.75 28,175.63 28,175.63 <br />. :Bituminous Path 31,000.00 31,000.00 <br />Structural Walls 225,000.00 225,000.00 <br /> Modular Wails 76,600.00 19,150.00 21,831.00 35,619.00 <br /> Fencin[L 8,750.00 8,750.00 <br /> Traffic Control 20,000.00 17,200.00 1,400.00 1,400.00 <br /> 10,000.00 10,000.00 <br /> Water Main 100,000.00 ~100,000.00 <br /> Mobiiization 80,000.00 68,800.00 5,600.00 5,600.00 <br /> Total Const.Cost 2,668,364.00 2,286,276.75 186,824.63 __~~,26262 <br /> 640,407.36 548,706.42 ! 44,837.91 46,863.03 <br /> 78,000.00 113,000.00 <br /> <br /> <br /> <br /> <br /> <br />Subject to available f1.mding and required approvals, a contract is scheduled to be let in tbe spring of <br />2005 and provide for completion ofa11 construction activities by Dccember 1,2005. <br /> <br />Ramsey County's policy seeks to gain approval of design concepts by municipalities before significant <br />completion of final plans and specifications. The signature of approval signifies that lhe municipalities <br /> <br />. <br /> <br /> <br />'\v:n:JC <br /> <br />'lJ 10U4 <br /> <br /> <br />q <br />