Laserfiche WebLink
<br />I <br /> <br />City o.f Arden Hills CIP Data Entry Form <br /> <br />Insert Picture Here <br /> <br /> <br />Project <br />Name <br /> <br />Replacement ofthe 1993 Front End Loader <br /> <br /> <br />2008 <br /> <br />$145,000 <br /> <br />Total <br />Project <br />Cost: <br /> <br />Funding <br />Sources <br /> <br />$72,500 General Fund; <br />$72,500 Water <br /> <br />PROJECT DESCRIPTION: <br />Replace the 1993 Front End Loader with a new loader that will have a snow plowing <br />capability_ In addition, the cab will be heated and air conditioned. The loader will have <br />additional ports for future attachments; grading, mowing, and sweeping which will make <br />the vehicle more efficient and versatile. <br /> <br />Project Rationale: <br />The current loader is limited in the job duties it can perform. Weare averaging 2,500 <br />hours per year usage. After 15 years, the loader is expected to have approximately <br />37,500 usage hours. <br /> <br />. <br /> <br />. , <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br />