<br /> Unit Contract Contract To-Date To-Date
<br />No. nem Unit Price Quantity Amount Quantity Amount
<br />55 INSTALL SIGN TYPE C EA $100,00 2,00 $200,00 0,00 $0,00
<br />~4 F&I SIGN PANEL TYPE C SF $31,00 28,00 $868.00 0.00 $0,00
<br />2564
<br />57 8ALE CHECK EA $6,00 200,00 $1,200,00 0,00 $0.00
<br />2573
<br />58 SILT FENCE, TYPE HEAVY DUTY LF $2.80 1,090,00 $3,052.00 675,00 $1,890,00
<br />2573
<br />59 ROCK CONSTRUCTION ENTRANCE EA $100,00 2,00 $200,00 0.00 $0.00
<br />2573
<br />60 3\6' CROSSWALK PAVEMENT - EPOXY SY $10.00 8,00 $80,00 0.00 $0,00
<br /> MARKING
<br />3520
<br />61 12' STOP 8AR - EPOXY MARKING LF $50.00 2,00 $100,00 0.00 $0,00
<br />3520
<br />62 SEEDING AC $1.600.00 0,30 $480,00 0.00 $0,00
<br />2575
<br />63 SODDING, TYPE LAWN SY $2.80 10,186,00 $28,520.80 8,000,00 $22,400,00
<br />2575
<br />64 MULCH MATERIAL TYPE 1 TON $130.00 3,00 $390.00 0,00 $0,00
<br />2575
<br />65 DISK ANCHORING AC $400,00 0.30 $120.00 0.00 $0,00
<br />2575
<br />66 COMMERCIAL FERTILIZER ANALYSIS 22.5.10 LB $0,50 450,00 $225,00 250,00 $125.00
<br />2575
<br />67 CONSTRUCTION FENCE LF $3,00 150.00 $450,00 150,00 $450,00
<br />. Subtotal: $601,512,36 $508,227,96
<br />Schedule: B - STORM SEWER
<br /> Unit Contract Contract To-Date To-Date
<br />No. nem Unit Price Quantity Amount Quantity Amount
<br />1 CLEARING AC $1,850,00 1,50 $2,775.00 0,90 $1,665,00
<br />2101
<br />2 GRU881NG AC $1,850,00 1.50 $2,775.00 0,90 $1,665,00
<br />2101
<br />3 REMOVE RCP PIPE SEWER (STORM) LF $15,00 245,00 $3,675.00 137,00 $2,055,00
<br />2104
<br />4 REMOVE CMP PIPE CULVERTS AND APRONS LF $15.00 100,00 $1 ,500.00 25,00 $375.00
<br />2104
<br />5 REMOVE DRAINAGE STRUCTURE EA $525.00 5.00 $2,625.00 5,00 $2,625,00
<br />2104
<br />6 REMOVE RCP APRON EA $320,00 4.00 $1,280.00 2,00 $640,00
<br />2104
<br />7 COMMON CHANNEL EXCAVATION CY $12.64 1,120.00 $14,156.80 1,500,00 $18,960.00
<br />2105
<br />8 12' RC PIPE APRON EA $320,00 3,00 $960.00 4.00 $1,280.00
<br />2501
<br />9 21' RC PIPE APRON EA $440.00 1.00 $440,00 1,00 $440,00
<br />2501
<br />10 27' RC PIPE APRON EA $630.00 1.00 $630,00 1.00 $630,00
<br />_at
<br /> 12' TRASH GUARD FOR 12' PIPE APRON EA $260.00 2,00 $520,00 2,00 $520,00
<br />501
<br />12 4' PERF. PRC PIPE DRAIN LF $3,00 920.00 $2,760.00 600.00 $1,800,00
<br />2502
<br /> Page 5 ot9
<br />
|