My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-25-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 10-25-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:48 PM
Creation date
11/14/2006 3:36:28 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br /> <br />. ..__~__--.EifE.o[j1rden HillsS.!l'..!!(l!.a.~,!!.'!.!orm . <br /> <br />Insert Picture Here <br /> <br />_ -li PROJECT DATA . <br />,. - ____~n._ r <br />i Project I Repaint South Water Tower <br />: Name I <br />IP;~ject YWlp007 - <br /> <br />Total 1$500,000 <br />! Project I. <br />i Cost: . <br />i Funding I 500,000 Water Utility Funds <br />! Sources I <br /> <br />1 <br />J <br />1 <br />mm] <br />. __1j <br /> <br />i PROJECT DESCRIPTION: <br />i The items that are in need of repair will be laid out in the 2005 inspection report. Areas <br />, to be addressed include: <br />. Mold <br />. Mildew <br />. Rust <br />i · Chipping Paint <br />! Both the exterior and interior ofthe south water tower will be examined. The City logo <br />i will be placed on the outside of the water tower. <br />I <br />, <br />, <br />I <br /> <br />I Project Rationale: <br />I Standard maintenance procedure to extend the life of the south side water tower. Every <br />110 years reconditioning work should be scheduled, <br />I <br />! <br /> <br />I' <br /> <br />- <br /> <br />e <br /> <br />e <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.