Laserfiche WebLink
<br />I <br />I <br /> <br />. ..__~__--.EifE.o[j1rden HillsS.!l'..!!(l!.a.~,!!.'!.!orm . <br /> <br />Insert Picture Here <br /> <br />_ -li PROJECT DATA . <br />,. - ____~n._ r <br />i Project I Repaint South Water Tower <br />: Name I <br />IP;~ject YWlp007 - <br /> <br />Total 1$500,000 <br />! Project I. <br />i Cost: . <br />i Funding I 500,000 Water Utility Funds <br />! Sources I <br /> <br />1 <br />J <br />1 <br />mm] <br />. __1j <br /> <br />i PROJECT DESCRIPTION: <br />i The items that are in need of repair will be laid out in the 2005 inspection report. Areas <br />, to be addressed include: <br />. Mold <br />. Mildew <br />. Rust <br />i · Chipping Paint <br />! Both the exterior and interior ofthe south water tower will be examined. The City logo <br />i will be placed on the outside of the water tower. <br />I <br />, <br />, <br />I <br /> <br />I Project Rationale: <br />I Standard maintenance procedure to extend the life of the south side water tower. Every <br />110 years reconditioning work should be scheduled, <br />I <br />! <br /> <br />I' <br /> <br />- <br /> <br />e <br /> <br />e <br /> <br />26 <br />