Laserfiche WebLink
<br />- <br /> <br />. <br /> <br />. <br /> <br />COUNCIL APPROVAL at the time of submittal for building permit(s) FINAL <br />PUD"; <br />k) Page 6, parking Requirements, #3, second line should read, "., ,shall be screened <br />with BERMING AND LANDSCAPING OR a decorative wall OF <br />COMP ATffiLE MATERIALS". "; <br />I) Page 6, Loading Docks, third line, should read, ". ,.by means of landscaping <br />which is at least 80% opaque within two years ef AND by a screen wall.. ," and <br />m) Pages 8 and 9, Signage, be removed in its entirety from the document for review <br />during the final POD process, with the exception of#2 J, which should read as <br />follows, "Temporary leasing signs and marketing signs will be allowed AS <br />RECOMMENDED TO CITY COUNCIL BY STAFF", <br />2. Maximum office component requirement be increased from 50% to 100% as per the <br />"Variance Requests and Findings, (a)" section of the staff memorandum presented to <br />the Planning Commission on February 7, 200 I; <br />3. Minimum building size be reduced from 20,000 square feet to 6,000 square feet, as <br />per the "Variance Requests and Findings, (b)" section ofthe staff memorandum <br />presented to the Planning Commission on February 7, 2001, allowing no more than <br />two structures of this size on the property; <br />4. Maximum building height be increased from 35 feet to eight stories as per the <br />"Variance Requests and Findings, (c)" section of the staff memorandum presented to <br />the Planning Commission on February 7, 200 I; <br />5, Parking ramps/decks be permitted within the front yard setback and the side <br />yard/comer setback as per the "Variance Requests and Findings, (d)" section of the <br />staff memorandum presented to the Planning Commission on February 7, 2001; <br />6. Side yard interior and comer setbacks for the principal structure(s) must meet the <br />requirements ofthe Gateway Business District and are not pem1itted as proposed to <br />be decreased to 10' on the interior (where 20' is required) and 20' on the comer <br />(where 50' is required); <br />7, Reducing the specific landscape requirements (caliper inches) outlined in Appendix <br />A, Zoning Ordinance, relating to the square footage of floors of a building and <br />building height to reflect the proposed requirements in the applicant's Design <br />Standards as per the "Variance Requests and Findings, (f)" section of the staff <br />memorandum presented to the Planning Commission on February 7,2001; <br />8, A landscape performance bond at 125% of the cost of materials and installation must <br />be provided prior to the issuance of a building permit; <br />9. Park land dedication will be required as part of the final plat, not to exceed ten <br />percent of the area of the property or, if providing cash in lieu of land, the fair market <br />value of the property at the time of approval; <br />10, A permit from Rice Creek Watershed District will be required following City <br />approval; <br />11, A monument sign at the comer of Highway 96 and Round Lake Road (City property) <br />would need to be reviewed and approved by the City Council prior to construction; <br />12. Due to the time requirements ofland acquisition and securing major tenants, the time <br />requirement for the final plan to be submitted no more than six months after the date <br /> <br />2 <br />