Laserfiche WebLink
<br />[-----~c . <br /> <br />City of/11'.lien Hills ClP Data.E-.n!1J!1'orm___._._____J <br /> <br />Iusert Picture Here <br /> <br />I~.='C'CC=..... ........... .............ccc.-..cc..~.=--.-..-.---------._----.-.---- <br /> <br />Ii ~~:j,r!.?;~~,~;~~f,~m"'" """';00 ! <br /> <br />i~_ _.. __--.-l <br />I'P;~j~~tyea~-r20-05- i <br />I I .__ i <br />I I ... .. .. - <br />I,,' Total , $115,000 <br />Project <br />i Cost: <br />Funding <br />Sources <br /> <br />i 115,000 Utillity Water Funds <br /> <br />I <br />I <br />i. <br />I <br />---------~ <br /> <br />PROJECT DESCRIPTION: <br />The Karth Lake east neighborhood is currently not looped/tied in to another water <br />system, Due to the lack of a water main extension, this area does not have a back-up <br />water system that is capable of providing water in an emergency situation, In addition <br />part of the current water system is currently running underneath Karth Lake. Staff is <br />unable to repair a leak in the water line that runs underneath the lake. <br /> <br />Project Rationale: <br />. This project could be tied together with the Lexington Avenue reconstruction project <br />The construction company would have the capability to lay the new water pipe <br />underneath this project. Ramsey County would complete the earth work and then bury <br />the water pipes for the City. The City would save money on engineering and <br />construction costs for this project. <br /> <br />i <br />_____ _____J <br /> <br />- <br /> <br />. <br /> <br />. <br /> <br />12 <br />