Laserfiche WebLink
<br />URS <br /> <br />Agenda Item 3D <br /> <br />MEMORANDUM <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612)370-1378 <br /> <br />To: <br /> <br />Ms. Michelle Wolfel <br />City of Arden Hills <br /> <br />Copy: <br /> <br />Nick Landwer/URS <br />Tom Moore/AH <br /> <br />File: <br /> <br />Pending <br /> <br />From: <br /> <br />Greg Brown <br />Arden Hills City Engineer <br /> <br />Date: <br /> <br />November 23, 2004 <br /> <br />Subject: <br /> <br />Authorization to Prepare Plans and Specificatious <br />2005 Lift Station Rehabilitation Project <br /> <br />Background <br />The current 5 year CIP includes the rehabilitation of lift station 4 and lift station 9 in 2005. As we <br />discussed at our last Engineering update meeting on August 13, 2004, the design for this project should <br />begin soon in order to complete plans and open bids by late January 2005. Thc rehabilitation oflift <br />stations is best done prior to heavy spring summer rains if possible, An early bid opening should allow a <br />contractor to complete the work by thc end of May, 2005. This project will be funded entirely from the <br />sanitary sewer utility and not require a fcasibility study or public hcaring. The estimated project cost is <br />approximately $200,000. <br /> <br />Recommendation <br />The City Engineer recommends that Council authorize staff and URS to prepare plans and specifications <br />for the 2005 Lift Station Rehabilitation Project. <br /> <br />PROJECTS\ARDENHJL\37951\GENERAL\Documcnts\Agenda Memo ] 1~23-04 2006 PMP doc <br /> <br />. <br /> <br />. <br /> <br />. <br />