My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-13-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 12-13-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:55 PM
Creation date
11/14/2006 3:36:51 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />Agenda Item 6C <br /> <br />. <br /> <br />URS <br /> <br />Memo <br /> <br />Thresher Square <br />700 Third Streel South <br />Minneapolis, MN 55415 <br />Phone: (612) 370.0700 <br />Fax: (612) 370.1378 <br /> <br />Cc: <br /> <br />Murtuza Siddiqui I Arden Hills <br />Finance Director <br />Michelle Wolfe I Arden Hills <br />Tom Moore I Arden Hills <br /> <br />Gregory S. Brown ~ p~ <br />Arden Hills City Engin~' <br /> <br />December 7,2004 <br /> <br />}i'ile: 31809367 <br /> <br />To: <br /> <br />From: <br /> <br />Date: <br /> <br />Subject: 2004 PMP - Edgewater Neighborhood <br />Construction Contract Change Order #1 <br /> <br />. <br /> <br />Background <br />The Council awarded the 2004 PMP Edgewater Neighborhood Reconstruction project to Amt <br />Construction of Hugo, MN on June 28, 2004 for $1,059,189.76. The project is essentially <br />complete with lhe exceplion of minor punchlist items and landscape warranty work. Three partial <br />payments totaling $915,414.64 have been approved by the council to date. <br /> <br />Change Order Description <br />Change Order #1 addresses additional water main work which was required for the 2004 PMP <br />Street Reconstruction Project. During utility construction activities, it became apparent thaI <br />several hundred feet of watermain along Edgewater A venue was in poor condition and should be <br />replaced. The watermain pipe and fittings in this area had significant amounts of corrosion <br />which would likely lead to multiple breaks in the future. The pipe was replaced to ensure the safe <br />and efficient water systcm operation would not be disrupted by breaks in the future. Any future <br />breaks would likely require the excavation and patching of the new roadway as well. <br /> <br />The need for the additional watermain work was verbally communicated to Council during the <br />project. The additional work was completed at contract unit prices or at negotiated prices for <br />items not included in the original contract. The total requested change order amount is <br />$34,170.00. A detailed cost breakdown is included with the attached Change Order document. <br /> <br />Recommendation . <br />The Cily Engineer recommends that lhe City Council approve Change Order #1 for lhc 2004 <br />PMP Project lotaling $34,170.00 (3.2% of the original contract amount). The contract amount of <br />$1,059,189.76 will therefore be increased by $34,170.00 to a new tolal contract amount of <br />$1,093,359.76. <br />
The URL can be used to link to this page
Your browser does not support the video tag.