Laserfiche WebLink
<br /> Unit Contract Contract To-Date To-Date <br />No. Item Unit Price Quantity Amount Quantity Amount <br />55 INSTALL SIGN TYPE C EA $100.00 2.00 $200.00 0.00 $0.00 <br />.:4 F&I SIGN PANEL TYPE C SF $31,00 28,00 $868.00 36.20 $1,122.20 <br />2564 <br />57 BALE CHECK EA $6.00 200.00 $1,200.00 0.00 $0.00 <br />2573 <br />5B SILT FENCE. TYPE HEAVY OUTY LF $2.S0 1.090.00 $3.052.00 675.00 $1,890.00 <br />2573 <br />59 ROCK CONSTRUCTION ENTRANCE EA $100.00 2.00 $200.00 0.00 $0.00 <br />2573 <br />60 3'x6' CROSSWALK PAVEMENT. EPOXY SY $10.00 8.00 $80.00 0.00 $0.00 <br /> MARKING <br />3520 <br />61 12' STOP BAR. EPOXY MARKING LF $50.00 2.00 $100.00 0.00 $0.00 <br />3520 <br />62 SEEDING AC $1,600.00 0.00 $0.00 0.00 $0.00 <br />2575 <br />63 SOODING, TYPE LAWN SY $2.80 10,186.00 $28,520.S0 9,000.00 $25,200.00 <br />2575 <br />64 MULCH MATERIAL TYPE 1 TON $130.00 3.00 $390.00 3.00 $390.00 <br />2575 <br />65 DISK ANCHORING AC $400.00 0.00 $0.00 0.00 $0.00 <br />2575 <br />66 COMMERCIAL FERTILIZER ANALYSIS 22.5.10 LB $0.50 0.00 $0.00 0.00 $0.00 <br />2575 <br />67 CONSTRUCTION FENCE LF $3.00 150.00 $450.00 150.00 $450.00 <br />. Subtotal: $600,687.36 $545,774,16 <br />Schedule: B - STORM SEWER <br /> Unit Contract Contract To-Date To-Date <br />No. Item Unit Price Quantity Amount Quantity Amount <br /> CLEARING AC $1,S50.00 1,50 $2.775.00 0,90 $1,665,00 <br />2101 <br />2 GRUBSING AC $1,S50,00 1.50 $2,775.00 0,90 $1,665.00 <br />2101 <br />3 REMOVE RCP PIPE SEWER (STORM) LF $15.00 245,00 $3,675,00 166,00 $2,490,00 <br />2104 <br />4 REMOVE CMP PIPE CULVERTS AND APRONS LF $15.00 100,00 $1.500,00 102,00 $1,530,00 <br />2104 <br />5 REMOVE DRAINAGE STRUCTURE EA $525.00 5.00 $2.625,00 5,00 $2.625,00 <br />2104 <br />6 REMOVE RCP APRON EA $320.00 4,00 $1,2S0,00 2.00 $640.00 <br />2104 <br />7 COMMON CHANN EL EXCA V A TION CY $12.64 1,120,00 $14,156,80 1,500,00 $18,960,00 <br />2105 <br />S 12' RC PIPE APRON EA $320.00 3.00 $960.00 2,00 $640,00 <br />2501 <br />9 21' RC PIPE APRON EA $440.00 1.00 $440.00 1,00 $440,00 <br />2501 <br />10 27' RC PIPE APRON EA $630.00 1.00 $630.00 1,00 $630,00 <br />.~01 12' TRASH GUARD FOR 12' PIPE APRON EA $260.00 2.00 $520.00 2.00 $520.00 <br />2501 <br />12 4' PERF, PRC PIPE DRAIN LF $3.00 920.00 $2,760.00 600.00 $1,SOO,00 <br />2502 <br /> Page 5 of 9 <br />