Laserfiche WebLink
<br />Application for Payment: Itemization <br />ehedule: A- <br /> Unit Contract Contract To-Date To-Date <br />No. Item Unit Price Quantity Amount Quantity Amount <br />1 MOBILIZATION LS $2.000.00 1.00 $2.000.00 1,00 $2.000.00 <br />2 MODULAR BLOCK RETAINING WALL WITH SF $21.50 400.00 $8,600.00 730.08 $lS.696.72 <br /> DRAINAGE <br />3 FENCE RAILING (CHAIN LINK) LF $13.75 120.00 $1,650.00 120.00 $1,650,00 <br />4 3' BITUMINOUS PAVING SF $4.25 1,250.00 $5.312.50 1,250.00 $5,312.50 <br />5 CLASS 5 AGGREGATE BASE TON $4.00 37S,00 $1,500.00 375,00 $1,500.00 <br />6 4' CONCRETE PAVING WITH 6' AGGREGATE SY $60.00 2S.00 $1.500.00 25.00 $l,SOO.OO <br /> BASE <br />7 SITE GRADING (INCL TOPSOIL AND SOD) SY $4.10 2.100.00 $8.610.00 1,000.00 $4.100.00 <br />8 BERM REMOVAL CY $2.S0 1.300.00 $3,250,00 1,300.00 $3.250.00 <br />9 8' HOPE (DIRECTIONAL BORING) LF $18,00 350.00 $6.300.00 300.00 $5.400.00 <br />10 DRAINAGE STRUCTURE TYPE H WITH R4370 EA $1.SS0,00 1.00 $1.550.00 1.00 $1,550,00 <br /> TYPE 0 CASTING <br />. WOOO FI8ER BLANKET SY $2.75 555.00 $1,526.25 0.00 $0.00 <br />12 SILT FENCE LF $4.50 200,00 $900.00 0.00 $0.00 <br /> Subtotal: $42,698.75 $41.959.22 <br /> Grand Total: $42,698.75 $41,959.22 <br /> <br />. <br /> <br />Page 3 of 4 <br />