Laserfiche WebLink
<br />~;,. <br />, <br />f <br /> <br />.J. <br /> <br />1 <br />! <br />~.,J <br /> <br />J <br />] <br />;;j <br />- <br />I <br />~ <br />Z <br />J. <br />") <br />" <br /> <br /> <br />I <br />I <br />J <br />J <br />:1 <br />'J <br />",J. <br />J <br />J <br />~'CJ <br /> <br />#.1 <br /> <br />4.0 <br /> <br />RECOMMENDATIONS <br /> <br />Based on the survey of 1450 County Road G West conducted on November 18, 2004, <br />DPRA makes the following recommendations: <br /> <br />4.1 <br /> <br />Asbestos <br /> <br />This survey was conducted to locate asbestos-containing materials that must legally be <br />removed prior to demolition of the building. Regulations require that all ACM which are <br />friable or will become friable during demolition must be removed from the building prior <br />to demolition by a licensed asbestos abatement contractor. <br /> <br />ACM does not need to be removed prior to demolition if it meets one of the following <br />criteria: (a) it is a Category I non friable ACM that is not made friable during the <br />demolition process; (b) it is a component that is encased in concrete or other similarly <br />hard material and is adequately wet whenever exposed during demolition; (c) it was not <br />accessible for testing and therefore was not discovered until after demolition began and, <br />as a result of the demolition, cannot be safely removed; or (d) it is a Category II <br />nonfriable ACM and the probability is minimal that the material will become crumbled, <br />pulverized, or reduced to powder during demolition. If ACM is not removed because of <br />safety reasons, the exposed RACM and any asbestos-contaiuing debris must be treated as <br />asbestos-contaiuing waste material and kept adequately wet at all times until disposed, <br /> <br />The following materials must be removed from the building on the subject property prior <br />to demolition: <br /> <br />Interior window glazing <br />Interior mesh window glazing <br />Sink coating <br /> <br />The following asbestos-containing materials may be left in place during demolition <br />provided that they are kept wet whenever they become exposed during demolition. <br /> <br />Venniculite <br /> <br />If the vermiculite is left in place, then the demolition debris from the north section of the <br />building must be treated as asbestos containing and disposed of at a proper landfill that <br />accepts asbestos-containing demolition debris. <br /> <br />4.2 <br /> <br />PCB-Containing Equipment <br /> <br />The air compressor and ballasts should be removed prior to demolition. The ballasts <br />should be inspected to determine if they are labeled "No PCBs". Any ballast which is not <br />labeled "No PCBs" should be assumed to contain PCBs. All of the ballasts, PCB or non- <br />PCB, should be properly disposed of after being removed from the building. <br /> <br />1450 County Road G West <br />Arden Hills, MN <br /> <br />Demolition Asbestos Survey <br />DPRA Project No. 50062.0001,0002 <br />December 9, 2004 <br /> <br />8 <br />