<br />Application for Payment: Itemization
<br />ehedule: A-ROADWAY
<br /> Unit Contract Contract To.Date To-Date
<br />No. Item Unit Price Quantity Amount Quantity Amount
<br />1 MOBILIZATION LS $96,000.00 0.70 $67,200,00 0,70 $67,200.00
<br />2021.501
<br />2 CLEARING TREE $200.00 64,00 $12,800,00 224.00 $44,800.00
<br />2101.502
<br />3 GRUBBING TREE $75.00 64.00 $4,800.00 154,00 $11,550.00
<br />2101.507
<br />4 REMOVE RCP PIPE SEWER (STORM) LF $12.00 1,134.00 $13,60B,00 1,063,00 $12,756,00
<br />2104.501
<br />5 REMOVE WATER MAIN LF $16.00 113.00 $1,80B.00 B2,00 $1,312.00
<br />2104.501
<br />6 REMOVE CMP PIPE CULVERTS AND APRONS LF $12.00 341.00 $4,092,00 4B7,00 $5,B44,00
<br />2104.501
<br />7 REMOVE CURB AND GUTTER LF $1.50 1,671.00 $2,506,50 1,961,00 $2,941.50
<br />2104.501
<br />8 REMOVE GUARD RAIL.PLATE BEAM LF $6.00 201.00 $1,206.00 200.00 $1,200,00
<br />2104.501
<br />9 REMOVE BITUMINOUS PAVEMENT SY $1.25 30,400.00 $3B,000.00 28,134.00 $35,167.50
<br />2104.505
<br />10 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SY $2.00 1,888.00 $3,776.00 2,289.00 $4,578.00
<br />2104:505
<br />11 REMOVE CONCRETE DRIVEWAY SY $3,00 B28.00 $2,4B4.00 756.00 $2,26B.00
<br />2104.505
<br />. REMOVE RIP RAP CY $25.00 5,00 $125.00 5.00 $125.00
<br /> 4.507
<br />13 REMOVE CATCH BASIN EA $350.00 14.00 $4,900.00 14.00 $4,900.00
<br />2104.509
<br />14 REMOVE STORM MANHOLE EA $400,00 4.00 $1,600.00 4,00 $1,600.00
<br />2104.509
<br />15 REMOVE RCP APRON EA $300,00 12.00 $3,600.00 12,00 $3,600,00
<br />2104.509
<br />16 SAWING CONCRETE PAVEMENT (FULL DEPTH) LF $3,00 429,00 $1,287,00 394,00 $1,182,00
<br />2104.511
<br />17 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LF $2.00 1,391.00 $2,782.00 1,326.00 $2,652,00
<br />2104.513
<br />18 SALVAGE SIGN TYPE C EA $50,00 28.00 $1,400,00 26.00 $1,300,00
<br />2t04.523
<br />19 SALVAGE MAIL BOX EA $50.00 74,00 $3,700.00 75,00 $3,750,00
<br />2104.523
<br />20 COMMON EXCAVATION (P) CY $7.60 26,584.70 $202,043.72 27,274.70 $207,2B7.72
<br />2105.501
<br />21 SUBGRADE EXCAVATION (EV) CY $7.40 600,00 $4,440,00 2,212.00 $16,368.80
<br />2104.507
<br />22 SELECT GRANULAR BORROW (CV) CY $12.40 10,170,00 $126,108.00 10,170.00 $126,108.00
<br />2105.522
<br />23 COMMON BORROW (LV) CY $7.40 500.00 $3,700,00 2,291.00 $16,953.40
<br />2105523
<br />24 STREET SWEEPER (WITH PICKUP BROOM) HR $125,00 150.00 $18,750.00 34.00 $4,250.00
<br />2123.610
<br />. AGGREGATE BASE, CLASS 5 TON $9,70 550,00 $5,335,00 459,38 $4,455,99
<br /> 1.501
<br />26 AGGREGATE BASE (CV), CLASS S(P) CY $22,70 6,780.40 $153,915,OB 6,780.40 $153,915,OB
<br />2211.503
<br /> Page 3 of 9