My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-10-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
01-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:44 AM
Creation date
11/14/2006 4:22:25 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br />2005 PAVEMENT MANAGEMENT PROGRAM <br /> <br />~ I. SUMMARY <br /> <br />I~ <br /> <br />The Red Fox / Grey Fox Commercial area is in the City's 2005 capital improvement program for <br />a number of factors including poor existing pavement conditions, poor drainage infrastructure <br />along Dunlap Street and the TH 51 Frontage Road and lack of water quality treatment for most <br />of the runoff generated from City S(f.'~5, The improvements outlined in this report will bring the <br />Dunlap Street and TH 51 Frontage Road pavements up to City standards as well as rejuvenate <br />and extend the useful life of the Grey Fox Road, Red Fox Road and Northwoods Drive <br />pavements. In addition, watermain valves, hydrants and sanitary sewer systems will be <br />rehabilitated to reduce the likelihood of operational problems in the future for those systems. A <br />number of relatively low cost water quality enhancements are proposed with the project which <br />will ultimately improve the quality of Lake Valentine and Rice Creek, <br /> <br />A number of alternatives have been outlined in the feasibility report including a range of options <br />for the reconstruction (or removal) of the TH 51 Frontage Road, In addition we have estimated <br />the cost to construct sidewalk along some of the roadways in the area for the Council's <br />consideration, We have attempted to provide Council with general descriptions and estimated <br />costs of the proposcd improvements and alternatives in the report. More detailed information and <br />analysis will be provided depending on the direction Council wishes to take, <br /> <br />Project costs, as illustrated herein, are reasonable and representative of the proposed scope of <br />improvements. The estimated project costs for the improvements included with this report are <br />within the amounts estimated as a part of the City's Capital Improvement Program, <br /> <br />URS <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.