Laserfiche WebLink
<br />, <br /> <br />URS <br /> <br />AGENDA ITEM 3.B <br /> <br />BRW: Inc. <br /> <br />URS <br />1bresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br /> <br />. <br /> <br />To: <br /> <br />Murtuza Siddiqui/ Arden Hills <br />Finance Director <br />Michelle Wolfe/ Arden Hills <br />Tom Moore/ Arden Hills <br /> <br />File: 31809733.00301 <br /> <br />Cc: <br /> <br />From: Gregory S. Brown <br />Arden Hills City Engineer <br /> <br />Date: September 2, 2005 <br /> <br />Subject: 2005 Sanitary Sewer Rehabilitation Project, Pay Estimate #2 <br /> <br />Background <br />The City of Arden Hills awarded Gridor Construction Inc., of Plymouth, MN the 2005 Sanitary . <br />Sewer Rehabilitation Project on April 25, 2005 for a total contract amount of $236,758.00. Pay <br />Estimate #1, in the amount of $94,172.36, has been approved by the Council. <br /> <br />Project Status <br />Lift Station #9 <br />Lift Station #9 has been operational for approximately a month. Site restoration and <br />driveway paving are the major items which need to be completed and this work will be <br />done in conjunction with Lift Station #4 within the next few weeks. We will then host a <br />punchlist meeting with the Contractor and the Operations and Maintenance Staff to <br />review the work. <br /> <br />Lift Station #4 <br />Gridor has just completed the start-up at Lift Station #4 this week. Work completed <br />includes, but is not limited to, the installation of the 72" wet well manhole and the 60" <br />valve manhole as well as the plumbing for both. All accessories needed for each pump <br />assembly were also installed, as well as the installation of the pumps themselves. The <br />electrical control panel is complete including all required wiring and the forcemain <br />connection has been made. As with Lift Station #9, site restoration and driveway paving <br />are the major items left to be completed and once they are done we will host a punchlist <br />meeting to review the site. <br /> <br />Recommendations <br />The Arden Hills City Engineer recommends the Council approve Pay Estimate #2 for <br />Gridor Construction Inc., of Plymouth, MN in the amount of $105,579.39. <br /> <br />. <br />