My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
09-12-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:46 AM
Creation date
11/14/2006 4:22:50 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Unit Contract Contract To Date To Date <br />. No. Item Unit Price Quantity Amount Quantity Amount <br /> 54 TRAFFIC CONTROL LS $2,200.00 1.00 $2,200.00 1.00 $2,200.00 <br /> 2563.601 <br /> .5 INSTALLSIGNTYPEC EA $100.00 2,00 $200.00 2.00 $200.00 <br /> 64.602 <br /> 56 F & I SIGN PANEL TYPE C SF $31.00 28.00 $868,00 36.20 $1,122.20 <br /> 2564.531 <br /> 57 BALE CKECK EA $6.00 200.00 $1.200.00 0.00 $0,00 <br /> 2573.501 <br /> 58 SILT FENCE, TYPE HEAVY DUTY LF $2.80 1,090.00 $3,052.00 700.00 $1,960.00 <br /> 2573.502: <br /> 59 ROCK CONSTRUCTION ENTRANCE EA $100.00 2.00 $200.00 0.00 $0.00 <br /> 2573.502 <br /> 60 3'><6' CROSSWALK PAVEMENT - EPOXY MARKING SY $10.00 8.00 $80.00 0.00 $0.00 <br /> 2564604 <br /> 61 12" STOP BAR. EPOXY MARKING LF $50.00 2.00 $100.00 0.00 $0.00 <br /> 2564-.603 <br /> 62 SEEDING AC $1,600.00 0.30 $480.00 0.50 $800.00 <br /> 2575.501 <br /> 63 SODDING, TYPE LAWN SY $2.80 10,186.00 $28,520.80 10,096.00 $28,268.80 <br /> 25-7S.~ <br /> 64 MULCH MATERIAL TYPE 1 TON $130.00 3.00 $390.00 5.00 $650.00 <br /> 25-75,Sll <br /> 65 DISK ANCHORING AC $400.00 0.30 $120.00 0.50 $200.00 <br /> 2575.519 <br /> 66 COMMERCIAL FERTILIZER ANALYSIS 22.5.10 LB $0.50 450.00 $225.00 400.00 $200.00 <br /> 25-75.532 <br /> 67 CONSTRUCTION FENCE LF $3.00 150.00 $450.00 150.00 $450.00 <br /> 25-75.603 <br /> . Subtotal: $601,512.36 $586,711.86 <br /> Schedule: B - STORM SEWER <br /> Unit Contract Contract To Date To Date <br /> No. Item UnJl. Price Quantity Amount Quantity Amount <br /> CLEARING AC $1,850.00 1.50 $2,775.00 0.90 $1,665.00 <br /> 2101.501 <br /> 2 GRUBBING AC $1,850.00 1.50 $2,775.00 0.90 $1,665.00 <br /> 2101.506 <br /> 3 REMOVE RCP PIPE SEWER (STORM) LF $15.00 245.00 $3,675.00 166.00 $2,490.00 <br /> 2104.S01 <br /> 4 REMOVE CMP PIPE CULVERTS AND APRONS LF $15.00 100.00 $1,500.00 102.00 $1,530.00 <br /> 2104.501 <br /> 5 REMOVE DRAINAGE STRUCTURE EA $525.00 5.00 $2,625.00 6.00 $3,150.00 <br /> 2101.509 <br /> 6 REMOVE RCP APRON EA $320.00 4.00 $1,280.00 2.00 $640.00 <br /> 2104.509 <br /> 7 COMMON CHANNEL EXCA V A TION CY $'2.64 1120.00 $14,156.80 1.500.00 $18,960.00 <br /> 2105.511 <br /> 8 12' RC PIPE APRON EA $320.00 3.00 $960.00 3.25 $1,040.00 <br /> 2501.515 <br /> 9 2'" RC PIPE APRON EA $440.00 1.00 $440.00 1.00 $440.00 <br /> 2501.515 <br /> 10 27' RC PI PE APRON EA $630.00 1.00 $630.00 1.00 $630.00 <br /> e"'" <br /> ,1 12" TRASK GUARD FOR 12" PIPE APRON EA $260.00 2.00 $520.00 6.28 $1,632.80 <br /> 2501.602 <br /> Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.