Laserfiche WebLink
<br />. <br /> <br />determined by Buyer and otherwise in a form satisfactory to Buyer, in Buyer's sole <br />discretion, and not disclosing any encumbrance not acceptable to Buyer in Buyer's <br />sole discretion, except for the Permitted Encumbrances described in Section 8.3. <br />Buyer does not, by its execution hereof, waive any right to exercise this condition on <br />account of any Permitted Encumbrance or other encumbrance or other matter of which <br />it has knowledge as of the date hereof. Buyer is the benefitted party to this <br />contingency. <br /> <br />5.2 Survey. On or before One Hundred and Twenty (120) days from the <br />Execution Date, Buyer (a) shall obtain an AL TA survey bearing the legal description of <br />the Initial Property and the Property, and showing the area, dimensions and location of <br />the Property, the topography, the location of all available utilities, the location of all <br />improvements and encroachments, the location of any recorded easements, which <br />survey shall be prepared at Buyer's expense; and (b) shall have satisfied itself, in its <br />sole discretion, that the survey does not disclose any condition rendering the Property <br />unusable as a 24-hour "Holiday Stationstore" with a car wash ("Proposed Use"). Buyer <br />is the benefitted party to this contingency. <br /> <br />. <br /> <br />5.3 TestinQ. On or before One Hundred and Twenty (120) days from the <br />Execution Date, Buyer shall have determined, in its sole discretion and at Buyer's <br />expense, that it is satisfied with (a) the results of and matters disclosed by soil tests, <br />engineering inspections, hazardous substance and environmental reviews of the <br />Property, including that the Property is (1) free from Hazardous Substances; and (2) <br />sufficient for the Proposed Use, including grades, elevations and compactions; and (b) <br />all other inspections and due diligence regarding the Property. Buyer is the benefitted <br />party to this contingency. <br /> <br />5.4 Utilities. On or before One Hundred and Twenty (120) days from the <br />Execution Date, Buyer shall have satisfied itself, in Buyer's sole discretion, that water <br />and gas mains, electric power lines, sanitary and storm sewers and other utilities are <br />available to the Property and adequate for the Proposed Use. Buyer is the benefitted <br />party to this contingency. <br /> <br />5.5 Approvals. On or before One Hundred and Eighty (180) days from the <br />Execution Date, Buyer shall have obtained, at Buyer's expense, all appropriate <br />approvals and permits necessary, in Buyer's sole discretion, for the Proposed Use, <br />which approvals may include, without limitation, appropriate zoning, subdivision <br />pursuant to Section 10, platting, conditional use permits, curbcut and other access <br />permits, signage permits, building permits, required licenses and site plan approval <br />and architectural approval. Buyer agrees to proceed diligently and Seller agrees to <br />cooperate. Buyer is the benefitted party to this contingency. Provided, however, that <br />nothing herein shall obligate Seller to approve development permits for the Property <br />unless the development application and/or proposed use comply with Seller's <br />development regulations. <br /> <br />. 5.6 Access/Roads. On or before One Hundred and Twenty (120) days from <br />the Execution Date, Buyer shall have satisfied itself, in Buyer's sole discretion, that <br /> <br />Purchase Agreell1€nt4 <br /> <br />3 <br />