My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-28-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
02-28-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:45 AM
Creation date
11/14/2006 4:23:04 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br /> <br />. <br /> <br />February 22, 2005 <br /> <br />Agenda Item 6.G ' <br /> <br />Ms. Michelle Wolfe <br />City Administrator <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: 2005 Sanitary Sewer Rehabilitation Project <br />Lift Stations #4 and #9 Reconstruction <br /> <br />Dear Ms. Wolfe, <br /> <br />Bids were received and opened for the above-referenced project on Febmary 15.2005, Bids were received from <br />nine (9) contractors, The tabulated bid outcome is as follows: <br /> <br />I <br />2, <br />3, <br />4. <br />5, <br />6. <br />7. <br />8- <br />9, <br /> <br />Contractor <br />Gridor Construction, Inc. <br />Penn Contracting, Inc. <br />Park Construction Co. <br />Eng. & Const. Innovations, Inc. <br />Jay Bros.. Inc. <br />Veit & Company, Inc, <br />Carl Bolander & Sons Co. <br />Three Rivers Construction <br />Barbarossa & Sons, Inc. <br /> <br />. <br /> <br />Bid Totals <br />$236,758.00 <br />$249,304.50 <br />$264.339.95 <br />$279,488,00 <br />$281,068.60 <br />$281,602.50 <br />$289,500.00 <br />$298,623.64 <br />$300,539;25 <br /> <br />Engineer's Estimate <br /> <br />$240,000.00 <br /> <br />All bids had proper bid guarantees in the amount often percent (10%) of the total bid as required by the Project <br />Manual. URS completed a bid tabulation to verify the total bid amounts and have attached a copy of the bid <br />tabulation for your information. <br /> <br />Gridor Construction, Inc. submitted the low bid with a total bid amount of $236,758,00. The Engineer's Estimate <br />reflects current market prices based on recent projects in the Twin Cities metro area. The low bid is approximately <br />1.4% lower than the Engineer's Estimate indicating a reasonable price for the scope of work included with the <br />project. In general, construction costs have increased significantly during 2004 when this project was budgeted due <br />to increased cost of steel, higher fuel prices and increased labor costs. Considering the large field of bidders, the <br />low bid appears to he very competitive in the current market. <br /> <br />. <br /> <br />Thresher Square. 700 Third Srree! South. Suile 600. Minneapolis, MN 55415. Phone: (612) 370,0700. Fax: (612) 370.1378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.