My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
04-25-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:45 AM
Creation date
11/14/2006 4:24:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />~ <br />~~HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />April 25, 2005 <br /> <br />Agenda Item 6.D <br /> <br />TO: Mayor and City Council <br />FROM: Peter Hellegers, City Planner ~ <br /> <br />SUBJECT: PC #05-11, Roland Kmjalahti <br />1137 Edgewater Avenue <br />Variance <br /> <br />Requested Action <br /> <br />The applicant has requested a 5-foot front yard setback variance and a 10-foot side yard corner <br />setback variance for the construction of a new single family detached house on the applicant's <br />property at 1137 Edgewater Avenue in Arden Hills, <br /> <br />Planninl! Commission Recommendation <br /> <br />Recommendation and Conditions of Approval <br />At their April 6, 2005 meeting the Planning Commission reviewed Planning Case #05-11 and <br />unanimously recommended approval (4-0) ofthe Side Yard Comer and Front Setback variances <br />subject to the following conditions: <br />I, The applicant shall file all necessary building permits with the Building Official for <br />approval prior to the issuance of a building permit. Building permit plans shall be <br />submitted to the Building Official a minimum of two (2) weeks before the planned start <br />of construction, <br />2, A drainage swale should be constructed along the western portion of the property to <br />collect the drainage water flowing westward down the hill of the property and carry the <br />drainage toward the street. A revised grading the drainage plan showing this drainage <br />swale shall require the approval of the Arden Hills City Engineer prior to the issuance of <br />any building permits. <br />3. A revised grading and drainage plan showing the elevation of the first floor and basement <br />and the surrounding property shall be submitted to the City and shall require approval by <br />the City Engineer prior to the issuance of any building permits. <br />4. The applicant shall be required to re-plat or convey by minor subdivision the property <br />prior to the issuance of any building permits, <br /> <br />. \\Earth\Planning\Planning Cases\2005\05-11 Karjalahti Variance (PENDING)\04~25-05 CC Report OS-II.doc <br /> <br />Page 1 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.