My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
05-09-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:45 AM
Creation date
11/14/2006 4:24:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />URS <br /> <br />ITEM 6.E <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612)370-0700 <br />Fax: (612) 370-13783 <br /> <br />To: <br /> <br />Michelle Wolfe/ <br />Arden Hills <br /> <br />Copy: <br /> <br />Tom Moore/Arden Hills <br />Jim Perron/Arden Hills <br />Frank Ticknor/ URS <br /> <br />File: <br /> <br />31809831.00101 <br /> <br />From: Gregory Brown, PE <br />Arden Hills City Engineer <br /> <br />Date: May 9,2005 <br /> <br />Subject: Authorization to Advertise for Bids <br />2005 Sealcoat Project <br /> <br />Background <br />As part of the continuing maintenance ofthe City pavement infrastructure, the City has budgeted <br />$50,000 towards street sealcoating projects performed generally once every two years. The last <br />project was completed in 2003. Typically the City has been sealcoating streets within 2-3 years of <br />reconstruction or overlay work and then on recurring intervals of 8 years. All of the streets <br />included with this years program have been reconstructed or overlayed within the last 3 years. <br />City crews perform crack sealing prior to the contractor's sealcoating operation. Following the <br />sealcoating operation, City crews sweep the streets and collect the excess aggregate material. <br /> <br />Project Description <br />The project area for this year includes the Karth Lake East neighborhood (overlayed in 2003), the <br />Ingerson neighborhood (reconstructed in 2003) and the Edgewater neighborhood (reconstructed <br />in 2004). The project includes a bid alternate for the sealcoating of Cummings Park Drive <br />(reconstructed in 2003) which could be awarded if bids are favorable. Streets such as Tiller Lane <br />and Amble Drive are included with this project although they were not part ofthe recent capital <br />improvements projects. The attached Exhibit illustrates the streets included with the 2005 <br />sealcoat project. <br /> <br />The proposed work indicated here is based on final Plans and Specifications prepared by the City <br />engineer. The estimated cost of construction is approximatcly $42,000 with the overall Project <br />cost approximately $50,000. The estimated cost reflects recent discussions with potential <br />contractors to account for the current oil prices. The adopted budget includes an overall project <br />cost of $50,000 (general fund). The Lift Station Reconstruction project is funded entirely under <br />the Sanitary Sewer Enterplise Fund which has a current balance of $1,138,151. <br /> <br />C\DocumenlS and Settings\schav.l1.johnson\Local Settings\Ternporary lnlemet Fi1es\OLK85\Agcnda Memo 5-9-05 2005 Sea1coat Ad <br />Authorization.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.