Laserfiche WebLink
<br />Findings and Recommendation <br />In regard to the Sign Standard Adjustment criteria staff has made the following findings: <br /> <br />. <br /> <br />1. There are site conditions (traffic, readability for traffic moving 50+ mph) which require a <br />sign adjustment to allow the sign to be reasonably visible from a street immediately adjacent <br />to the site. <br /> <br />2. The sign adjustment will allow a sign of exceptional design or a style that has potential to <br />enhance the area (one sign for several agencies) and is more consistent with the arehiteeture <br />and design of the site. <br /> <br />3. The sign adjustment will result in a sign that is inconsistent with the purpose of the sign <br />district and the zoning district in which the property is located. <br /> <br />Therefore, in Planning Case #05-10 staff recommends denial of the Sign Standard Adjustment <br />based on the aforementioned findings and for the following reasons: <br /> <br />1. While the sign would be visible from Highway 96, the amount of information <br />required for sign and the speed of traffic on Highway 96 (which would increase the <br />need larger text) may require a Sign Standard Adjustment. However, a smaller <br />variance from the Sign Ordinance Standards would still result in greater visibility and <br />would be more consistent with the City's Sign Ordinance Standards. <br /> <br />2. <br /> <br />The proposed sign is inconsistent with both the Civic Center Zoning District and Sign <br />District 6 which anticipated more destination oriented facilities that would not require <br />as much signage as the commercial zoning and signage districts. The proposed sign <br />is much larger than allowed for any commercial zoning and signage districts in the <br />City. <br /> <br />. <br /> <br />Plan Review Comments <br /> <br />A. Ifbuilding or electrical permits are required, applications and plans shall be submitted to <br />the Building Official a minimum of two (2) weeks before the planned start of <br />construction. <br /> <br />B. No eonstruction shall begin before plans are approved by the City of Arden Hills' <br />Building Official. <br /> <br />C. A Sign Permit is necessary for all sign installation in the City of Arden Hills and would <br />still be required if this sign variance is approved. <br /> <br />\\Earth\Planning\P~anning Cases\2005\05-10 RCPWF Sign Variance (PENDING)\04-06-05 PC Report OS-tO.doc <br /> <br />Page 60f7 <br /> <br />. <br />