My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-31-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
05-31-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:45 AM
Creation date
11/14/2006 4:24:48 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,ark Plan <br /> <br /> <br />Our prqject (Pam will disa.J5s the <br />prqJect with the Gty of Ilrden Hills <br />and will keep the City informed of <br />progress. <br /> <br />. <br /> <br /> <br />ConditkJn values will be assigned <br />to city streets based on the PASEk <br />manuals. <br /> <br />~ <br /> <br />JII City of Arden Hllfs <br />lilt PCl5treet RatJngs <br /> <br />Task I: Project Management <br />. Project Management includes all activities to oversee and direct the project <br />and to help ensure it stays on sd1edule and on budget. <br />. Project Manager Mark Daly will provide meeting minutes, progress <br />schedule updates, and budget reports to keep the City advised of <br />project progress, <br /> <br />Task 2: Project Initiation <br /> <br />. The Bonestroo project team will meet with City staff to disruss project <br />expectations. . <br />. We will obtain the information needed to complete the project, including <br />maps, digital photos, and segment data. <br />Task 3: Setup Excel Spreadsheet <br />. We will incorporate the City's existing information into an Excel <br />spreadsheet <br />. The Excel file will allow direct entry of the pavement condition rating and <br />drainage information into the City.s pavement management system. This <br />creates a very user-friendly interlace. <br />. We will assign each street segment a condition score 10-100). <br />. We will discern the existence of drainage systems. <br /> <br />Task 4: Extract Pavement Condition Data from Reid <br />Reviews <br />We propose to use the Pavement Surface Evaluation and Rating jPASERJ <br />manuals to assign condition values to the city streets. PASER is a well <br />established rating system. Similar to bridge safety inspection, PASER uses <br />a rating system of I - 10 based on established degrees of deterioration, <br />The manual includes written descriptions and pictures of each level. <br /> <br />A Copy of the PASER manual for asphalt roads has been included in <br />Appendix A for your reference, or you may view the PASER asphalt and <br />concrete manuals online at: <br />- http://tic.engrwisc.edu/ManualS/Concrete-PASER 02,pdf <br />- http://tic.engr.wisc.edU/ManualS/Asphalt-PASER 02,pdf <br /> <br />. Using the PASER manuals, we will rate the pavement condition for each <br />street segment. <br />. The rater will input the pavement condition score directly into the <br />Excel file_The Excel file will convert the PASER score into equivalent <br />scores based on a 0-100 scale. <br /> <br />o Additional (Optionalt Services <br /> <br />These seNices are optional and listed as such on the cost form. Brief <br />information is included here describing two proposed additional <br />seNices, and we invite you to contact us for more information. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.