Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />2006 PAVEMENT MANAGEMENT PROGRAM <br /> <br />I L SUMMARY I' <br /> <br />The Ridgewood Neighborhood is in the City's 2006 Capital Improvement Program for several <br />reasons including poor existing pavement conditions, poor drainage infrastructure, lack of water <br />quality treatment and aging utility infrastructure. The improvements identified in this repOlt will <br />significantly improve the function and lifespan of the street, storm drainage, sanitary sewer and <br />watermain infrastructure tem and reduce maintenance costs for the foreseeable future. The <br />improvements will reduce or eliminate nuisance flooding which occurs throughout the <br />neighborhood while providing positive water quality treatment for the runoff generated in this <br />neighborhood prior to entering Lake Johanna. The residents of the neighborhood have been <br />engaged in the process to date and have generally confirmed the City's expressed need for the <br />improvements and feel the improvements will improve the overall neighborhood. Concerns <br />about minimizing disturbance to the character of the neighborhood have been registered and <br />ret1ected in the proposed nalTOW streets and use of natural water infiltration systems where <br />possib Ie. <br /> <br />We have attempted to provide Council with general descriptions and estimated costs of the <br />proposed improvements and alternatives/options for Council consideration in the repolt. More <br />detailed information and analysis will be provided on specific issues at the Council's request <br /> <br />Project costs, as illustrated herein, are reasonable and representative of the proposed scope of <br />improvements. The estimated project costs for the improvements included with this report are <br />slightly greater than the amounts estimated as a part of the five year Capital Improvement <br />Program but reflect the current construction costs that the market has been experiencing. <br /> <br />URS 19 <br />