Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />URS <br />BRW, Inc. <br /> <br />AGENDA ITEM 3.8 <br /> <br />URS <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 554t5 <br />Phone: (612) 370-0700 <br />Fax: (6t2)370-1378 <br /> <br />To: <br /> <br />Murtuza Siddiqui! Arden Hills <br /> <br />File: 31809733.00301 <br /> <br />From: Gregory S. Brown <br />Arden Hills City Engineer <br /> <br />Date: August 3, 2005 <br /> <br />Subject: 2005 Sanitary Sewer Rehabilitation Project <br />Pay Estimate #1 <br /> <br />Background <br />The City of Arden Hills awarded Gridor Construction Inc., of Plymouth, MN the 2005 <br />Sanitary Sewer Rehabilitation Project on April 25, 2005 for a total contract amount of <br />$236,758.00. <br /> <br />Project Status <br />Lift Station #9 <br />Gridor began the project at Lift Station #9 the first week of July and have been able to <br />complete about 80% of the work to this point in time. Work completed includes, but is <br />not limited to, the installation of the 72" wet well manhole and the 60" valve manhole as <br />well as the plumbing for both. All accessories needed for each pump assembly were also <br />installed, as well as the installation of the pumps themselves. The electrical control <br />panel, and all required wiring are near completion. The connection to the existing <br />forcemain and gravity lines, along with the removal ofthe existing station will be <br />completed this week. <br /> <br />Lift S tati on #4 <br />Gridor has also begun work at Lift Station #4 although sparingly. They have completed <br />the clearing of the site but will fully move over to Lift Station #4 after the completion of <br />Lift Station #9. <br /> <br />Recommendations <br />The Arden Hills City Engineer recommends the Council approve Pay Estimate #1 for <br />Gridor Construction Inc., of Plymouth, MN in the amount of $94,172.36. <br />