My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-11-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
10-11-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:46 AM
Creation date
11/14/2006 4:25:59 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br />/]'\~ HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />October 4, 2005 <br /> <br />Work Session AGENDA #2 <br /> <br />TO: Mayor and City Council <br />Michelle Wolfe; City Administrator <br /> <br />FROM: Thomas J. Moore; Direetor of Operations & Maintenance <br /> <br />SUBJECT: Gateway Sign Discussion <br /> <br />Backl!round <br />At the March 21, 2005 Council Worksession, staff presented a gateway sign update which <br />included possible sign locations, design styles, composition, lighting and landscape options. The <br />consensus reached by the City Council was: <br /> <br />I. The first sign location will be at the intersection of Cleveland and County Road D within <br />the existing easement. <br /> <br />2. Staff should incorporate the Kasota Stone to the composition of the gateway signs. The <br />Kasota Stone will be supplied from the City's stock pile leftover from the construction of <br />the City Hall. <br /> <br />3. Staff should bring back a cost estimate of a gateway sign using Kasota Stone. <br /> <br />4. Design Style #4 is the preferred design. <br /> <br />Review <br />Enclosed for City Council review are four sets of diagrams detailing the location, the preferred <br />design style, composition and lighting. The composition will be Kasota Stone for the base and <br />sides, concrete for the top and back and stecl for the logo. <br /> <br />Budl!et <br />The cost for this project will be $24,675. The 2005 CIP Budget for two gateway signs was <br />$30,000. <br /> <br />Requested Council Action <br />Review the presented material and provide work direction to the staff. <br /> <br />\\Metro-inet.us\ArdenHiIIs\PR&PW\Opcrations & Maintcnance\Memos\05 Gateway Signs Work Session.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.