Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />~ <br />EN HILLS <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: January 19, 2006 AGENDA ITEM 2,A <br />TO: Mayor and City Council <br />FROM: Kristine Giga, Civil Engineer ~ <br />SUBJECT: Five-Year CIP Discussion <br /> <br />Originally, staff anticipated a full discussion of the five-year CIP at this Work Session. A draft <br />five-year plan had been assembled based on the PCl ratings, recent bid results, the water tower <br />inspection results, and other information. Finance Director Siddiqui then began detailed analysis <br />of the financial impacts ofthe draft plan. It is clear at this time that the draft plan is not feasible <br />in its current state. Therefore, we are going to continue the financial analysis and develop a new <br />draft plan for discussion with the Council. <br /> <br />Attached are three individual memos from URS addressing the following items for discussion: <br />. PCI ratings (with data compiled by URS and Goodpointe Teclmology) <br />. 2006 Lift Station Rehabilitation Project <br />. South Water Tower Condition Assessment (with KTA-Tator, Inc. report) <br /> <br />\\Metro-inet.us\ArdenHiIIs\PR&PW\Operations & Maintenance\Engineering\2006\1-19.05 Memo CIP.doc <br />