My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-21-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 02-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:18 PM
Creation date
11/14/2006 4:42:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i' <br /> <br />Ie <br /> <br />C. PROJECT RELATED SERVICES <br /> <br />URS provides a full range of services under work orders for specific projects. Generally our services for specific <br />projects are based upon the construction value of the project at the time of bid. Our contract calculates the basis <br />for fees as the average of the lowest three bids received from contractors. Feasibility Report preparation, Final <br />Design and Bidding services are based upon cross referencing the construction basis with a fee curve adopted <br />by the American Society of Civil Engineers included with our contract. <br /> <br /> <br />Construction 01 Lake Lane Pond <br /> <br />The lower the fee basis, the higher the fee percentage for <br />feasibility, design and bidding. For example a $50,000 project <br />equates to a 10.05% fee while a $2,000,000 project equates to <br />5.75% fee. If the project does not require a feasibility report <br />(i.e,sanitary sewer or watermain projects), then the fee basis from <br />the curve is reduced by 35%, Another example, a $500,000 <br />roadway project equates to a 7.0% design fee while a $500,000 <br />lift station project equates to a 4,6% design fee, Construction <br />services are based upon a straight 10% of the construction basis <br />regardless of project size or type. <br /> <br />Land surveying for topography and easements are billed as additional services at an hourly rate similar to the <br />miscellaneous services, Expenses are billed through to the City with no markup. The following is a summary of <br />the projects, which were active between January 2004 and June 2005 including projects initiated in 2003 and <br />those still underway in 2004. <br /> <br />. <br /> <br /> <br />Interior 01 Booster Station <br /> <br />- <br /> <br /> <br />Grey Fox Road entrance to TH 51 <br /> <br />I) <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.