My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-21-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 02-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:18 PM
Creation date
11/14/2006 4:42:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BOOSTER STATION REHABILITATION PROJECT <br /> <br />. <br /> <br />Bids Open <br />Awarded Contractor <br />Awarded Contracl Price <br />Engineers Estimate <br /> <br />Number of Change Orders <br />Actual Final Construction Costs <br /> <br />Contract Completion Date <br />Actual Completion Date <br />As-Built Completion <br /> <br />URS Staff: <br />Project Manager <br />Project Engineer <br />Construction Inspectors <br /> <br />Greg Brown <br />Frank Ticknor <br />Mark Lynch, Frank Ticknor <br /> <br />November 13,2003 <br />EnComm Midwest, Inc. <br />$168,440.00 <br />$255,000.00 <br /> <br />None <br />$175,420.00 <br /> <br />May 15, 2004 <br />March 15, 2005 <br />July, 2005 <br /> <br /> <br />Comments: <br />~ Awarded amount did not include $6,980.00 for Bid <br />Alternate #1 (although Council motion was to award the <br />Bid Alternate).the difference is shown in the final . <br />construction costs <br />~ Very competitive bids significantly below budget <br />~ Station improvements well received by O&M staff <br />~ Station improvements provide more flexibility and <br />capabilities in operation of watermain system and have been utilized several times since completion of <br />the project <br />~ Some issues with initial pump installation required contractor to replace one pump (no City cost). These <br />issues delayed final completion for 10 months (although station was operable during this time) <br /> <br />URS Total Project Fees: <br /> <br />$28,466.00 (16.2% of construction) <br /> <br />~ <br /> <br />9 <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.