My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-21-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 02-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:18 PM
Creation date
11/14/2006 4:42:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br />~ <br /> <br />~ <br />~. <br />~ <br />( <br />( <br />~ <br />~ <br />~ <br />cr <br />cr <br />J <br />J <br />1 <br />] <br />l. <br /> <br />] <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- <br /> <br />2005 PMP: RED FOx/GREY Fox COMMERCIAL AREA <br /> <br />Bids Open <br />Awarded Contractor <br />Awarded Contract Price <br />Engineers Estimate <br /> <br />June 29, 2005 <br />Amt Construction <br />$1,375,247.66 <br />$1,345,000 <br /> <br />Number of Change Orders <br />Actual Final Construction Cost (estimated) <br /> <br />None <br />$1,365,000 <br /> <br />Contract Completion Date <br />Completion Date <br />As-Built Completion <br /> <br />November 15, 2005 <br />November 10, 2005 (substantial) <br />December, 2005 <br /> <br />VRS Staff: <br />Project Manager <br />Project Engineer <br />Construction Inspector <br />Survey Crew Chief <br /> <br />Greg Brown <br />Matt Harder <br />Mark Lynch <br />Jeff Haley <br /> <br /> <br />2004-5 Activities: <br />. Preliminary and Final design <br />. Easement Acquisition Documentation <br />. Coordination with MnDOT, property owners in <br />project area, Rice Creek Watershed District and <br />private utility companies. <br />. Construction Inspection/Administration <br /> <br />Existing Red Fox Road <br /> <br />Comments: <br />);> Design eliminated segment of costly street reconstruction <br />);> Design provided for water quality improvement in area of removed street segment allowing enhanced <br />water quality benefits <br />);> Design improved safety and efficiency of access to TH 51 <br />);> Project was generally well received by businesses including the removal of the street segment <br />);> URS staff responded/adjusted to MnDOT requests as well as property owner requests at last minute to <br />accommodate changes into the project. (Jack Hoeschler, Smiths Driveway) <br />);> MnDOT Hydraulics review required nearly 4 months of meetings, detailed hydraulic modeling and <br />modifications which extended into the period of construction, <br /> <br />VRS Total Project Fees: $ 269,000 (19. 7% of construction) <br /> <br />12 <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.