My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-21-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 02-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:18 PM
Creation date
11/14/2006 4:42:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />- <br /> <br />2006-2010 CIP <br />211 6/2006 <br />Page 3 <br /> <br />. Inflow and Infiltration (1&]) <br />City staff met with Met Council to discuss the current problem with I & I. Based upon <br />current data and conditions, the City could face a $500,000 surcharge with Met Council if <br />1&1 is not reduced. This charge would be paid over five years, starting in 2007, but would <br />be rctrievable if the City spent any money to reduce 1&1. However, the City could "opt <br />out" of the surcharge by committing an cqual or greater level oflocal funding, (whatever <br />amount is necessary), to implement 1&1 reduction. Staff is looking at what nccds to be <br />done to avoid the surcharge and is estimating costs of the necessary improvements. Staff <br />is also gathering information from past O&M procedures and projects that could be used <br />as to assist in 1&1 reduction as well. <br /> <br />Staff recommcndations: Based upon the projected fund balance, the possibility of acquiring <br />SCADA, and the immediate necd to address 1&1, staff is recommending to delay the lift <br />station reconstruction project and reject thc current bids. Once additional information is <br />gathered regarding costs associated to each of these potential projects, staff will evaluate <br />when sufficient funds would be available to completc the lift station reconstruction. <br /> <br />Storm Scwer Fund <br />The 2006 PMP project includes a proposed estimate of $410,000 to be used from the Storm <br />Sewer Fund. This amount will cause the fund balance to dip significantly below the informal <br />balance of $500,000. However, at the end of 2009, the projected balancc is estimated to <br />recover to about $600,000. <br /> <br />Watermain Fund <br />If the City takes on all the CIP and PMP projects as currently listed in the draft worksheet, <br />thc projccted balance at the end of 2009 is estimated to bc about $650,000. <br /> <br />PROJECT SCHEDULE 2006-2010 <br /> <br />The extent of the projects that are planned for 2006 and the remaining four years of the CIP are <br />dependent on scvcral factors, including those listed below. Staff would like input from Council <br />as to whcthcr to continue with 2006 projects as planned and input on the other factors for future <br />projects. <br /> <br />2006 PROJECTS (excluding 2006 PMP and Lift Station Reconstruction, discussed <br />above) <br /> <br />CSAH 96 Landscaping Proiect <br />Ramsey County will be participating in the funding of this project; the County will pay for <br />tree replacement at a 2:1 ratio of the number removed during the reconstruction of Highway <br />96. This equates to approximately $150,000 (45%) of the total project costs. Thc project may <br />also be eligible for up to approximately $30,000 in reimbursement from MSA funds. The <br />remainder of the costs (approximately $170,000) would be paid from the General Capital <br />Fund. Staff will be meeting with the County to discllss the cost-participation agreement, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.