My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-21-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 02-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:18 PM
Creation date
11/14/2006 4:42:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />- <br /> <br />Memorandum <br />February 14,2006 <br />Page 2 <br /> <br />amounted to only 2.2% of awarded construction amounts (5%-10% is common in the industry). We <br />attribute this to good quality plans and solid supervision of contractors during construction to minimize <br />claims. [ acknowledge that we need to focus on improving our estimates for budgeting of future projects. <br /> <br />The financial performance analysis chart also indicates total URS design and construction services fees <br />as a percentage of the construction contract amounts collective]y at 18.11 %. These fees are based upon <br />our contract terms, We feel are fees are very competitive in the industry where fees range as high as 25% <br />for similar work (Ramsey County Public Works charges 24% for its engineering services to the City). <br /> <br />New City Organizational Structure <br />We are excited to continue our relationship with the City under the revised organizational structure with <br />the hiring of Kristine Giga. Most of the metro area municipalities that we work in have in-house <br />engineering staff and we are very comfortable working in this type of organization. We are confident that <br />the single point of contact will ease some of the strains on communication lines that have occurred in the <br />past. We agree that we should revisit our fee structure especially as it relates to retainer type services <br />which willlarge]y be performed by Kristine as we move forward. <br />
The URL can be used to link to this page
Your browser does not support the video tag.