My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:24 PM
Creation date
11/15/2006 10:09:27 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VI. Project Cost and J.;'unding Summary <br /> <br />. <br /> <br />Preliminary project cost cstimates have been prcparcd fix thc proposed improvements and the <br />alternatives discusscd in this report for the consideration of the Couneil. Projeet costs shown <br />below include costs for engineering and construction inspection and administration. 20% is <br />included in the pathway costs and 25% for bridge costs (due to high eomplexity of bridge <br />construclion). The following is a summary of the estimated project costs for the reconunended <br />improvements and altematives. <br /> <br />Item Description <br />Bridge Improvements Option A <br />Bridge Improvements Option B <br />Bridge Improvements Option C <br /> <br />Proiect Cost <br />$ 60,000 <br />$ 80.000 <br />$200.000 <br /> <br />Sidewalk Improvements (6 foot Binlminous) <br />Sidewalk Improvements (6 foot Conerete) <br />Sidewalk lmprovements (8 foot Bimminous) <br />Sidewalk Improvements (8 foot Concrete) <br /> <br />S 54.400 <br />S 78.700 <br />S 69.1 00 <br />$101,500 <br /> <br />Bridge Enhancements - Ornamental Railing <br />Bridge Enhancements - Decorative Ughting <br />Bridge Enhancements - Form Liner Surface Treatment <br />Bridge Enhancements - Painting <br />Bridge Enhancements - Six Pilasters <br /> <br />525.000 <br />$10,000 <br />$10.000 <br />$ 5,000 <br />$ 5,000 <br /> <br />. <br /> <br />Sample Total Proiect Cost: <br />Bridge Option A+ 6 ft bit walk <br />Bridge Option B + 6 ft concrete walk + [{ailing <br />Bridge Option C + 8 ft bit walk + Railing + Lighting + Form Liners <br /> <br />$114.400 <br />$183.700 <br />$319,100 <br /> <br />Proiect Fundilll! <br />All of the improvements described in this report are eligible to be funded OUI of the City's State <br />Aid account since County Road E is designated as a County State Aid Highway. The current <br />State Aid fund balance for Arden Hills is approximately $500,000. The project is proposed to be <br />funded entirely from the City's Stale Aid funds however, the Council may elect to utilize other <br />funding sources such as the non-assessable street fund or the general fund. Since the proposed <br />improvements benefit the City as a whole to a greater degree than the abutting residents, the use <br />of residential assessments to fund the improvements is not recommended. <br /> <br />The costs shown above do not include annual maintenance costs sllch as snow removal and <br />potential maintenance of bridge improvcments. The Council may consider requesting Ramsey <br />County to maintain this facility (especially bridge improvements) and requesting abutting <br />residents to rcmove snow and mow along the sidewalk in lieu of City staff. <br /> <br />. <br /> <br />19 <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.