My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:24 PM
Creation date
11/15/2006 10:09:27 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />311/2004 <br /> <br />crn Or: ARDEN HILLS <br />COUNTY ROA.D F PEDESTRIAN WALK <br /> <br />PREUMINARY CONSTRUCTION COSTS <br /> <br /> 6' Bituminous Walk <br />Item No. Item Units Quantity Unit Price Amount <br />1 6' Bit Trail (includes base) SF I l250 $ 2.50 $ 28,1 00.00 <br />2 Sod LS I $ 4,00000 $ 4,000.00 <br />3 Grading (6' wide) LF 1875 $ 2.50 $ 4,700.00 <br />4 Ped Ramp EA 4 $ 500.00 $ 2,000.00 <br />5 Striping Changes (E) LS 1 $ 2.000.00 $ 2,00000 <br />6 Mobilization LS I $ 2,500.00 $ 2,500.00 <br />7 Concrete Curb (hand formed) LI- 80 $ 2500 $ 2,000.00 <br /> Construct Subtotal $ 45,300.00 <br /> 20% Engineering & Construction Administration $ 9,100.00 <br />. T alai Project Cost $ 54,400.00 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.