Laserfiche WebLink
<br />. <br /> <br />311/2004 <br /> <br />crn Or: ARDEN HILLS <br />COUNTY ROA.D F PEDESTRIAN WALK <br /> <br />PREUMINARY CONSTRUCTION COSTS <br /> <br /> 6' Bituminous Walk <br />Item No. Item Units Quantity Unit Price Amount <br />1 6' Bit Trail (includes base) SF I l250 $ 2.50 $ 28,1 00.00 <br />2 Sod LS I $ 4,00000 $ 4,000.00 <br />3 Grading (6' wide) LF 1875 $ 2.50 $ 4,700.00 <br />4 Ped Ramp EA 4 $ 500.00 $ 2,000.00 <br />5 Striping Changes (E) LS 1 $ 2.000.00 $ 2,00000 <br />6 Mobilization LS I $ 2,500.00 $ 2,500.00 <br />7 Concrete Curb (hand formed) LI- 80 $ 2500 $ 2,000.00 <br /> Construct Subtotal $ 45,300.00 <br /> 20% Engineering & Construction Administration $ 9,100.00 <br />. T alai Project Cost $ 54,400.00 <br /> <br />. <br />