Laserfiche WebLink
<br />. <br /> <br />311I2004 <br /> <br />CITY OF ARDEN HILLS <br />COUNTY ROAD E PEDESTRiAN WALK <br /> <br />PRELIMINARY CONSTRUCTION COSTS <br /> <br /> 8' Bituminous Walk <br />Item No. ltcm Units Quantitv Unit Price AmOJlIlt <br />] 8' Bit Trail (includes base) SF ]5000 $ 2.50 $ 37,500.00 <br />2 Sod LS 1 $ 4,000.00 $ 4.00000 <br />3 Grading LF ]875 $ 325 $ 6.100.00 <br />4 Ped Ramp EA 4 $ 500.00 $ 2.000.00 <br />6 Striping Changes (E) LS 1 $ 2,00000 $ 2.00000 <br />7 Mob L5 1 $ 4.00000 $ 4,000.00 <br />8 Concrctc Curb (hand formcd) LF 80 $ 25.00 $ 2,000.00 <br /> Constmct Subtotal $ 57.600.00 <br /> 20% Engineering & Construction Administration $ 11,500.00 <br />. T ota I Project Cost $ 69,100.00 <br /> <br />. <br />