Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. Replacing the south bridge rail system (currently 3.67 feet wide) with a newer F-type <br />rail design (1.67 feel wlde) <br />. Shiftmg Ihe centerline of County Road 10 3 feet This would require restriping of Ihe <br />roadway on eJlher slde of the bridge 10 move Iraffic back 10 the proper alrgnment <br />pnor to the slgnaJized intersections. <br />. Narrowmg the traffic Jane widths from IS feel to J4 feel m width (Ramsey County <br />has agreed to this in concept). <br />. Removal of Ihe north bridge rar! system and conslruction of cantilever suppons at the <br />eXIstlng north beanL <br />. RcconSlructlon of the north bridge rail over new extended suppons 10 include a 7.5- <br />foot sidewalk and a 12 inch wide bamer concrete fencing. <br /> <br />Due to Ihe significant grade west of the blidge, it has been estimated that approximately <br />1800 square feet of concrete relammg wall and ,,"ling wi II be required. <br /> <br />Project Cost <br />The estimated cost for the bridge improvemenls is $266.000. The City is requesting <br />$230,000 from MnDOT as pan of the management! safety calegory of Ihe Cooperative <br />Agreement funding. This contrihution includes constf1lction costs and 8% of the <br />estimated engineering cost for the project. The City of Arden llills will fund the <br />remaJnln9 balance. <br />c <br />