Laserfiche WebLink
<br />, <br /> <br />County Road E T rail Improvements <br />October 7, 2004 <br />Page 7 <br /> <br />. <br /> <br />Option 2 project costs are eligible for cooperatIve agreement funding. <br /> <br />2. Some of the estimated costs of the bridge options above arc hIgher than those listed in the <br />feasibility report in order to account for recent sIgnificant increases in the cost of steel. <br /> <br />3. Option C estimate includes intenor safety rail between SIdewalk and roadway (not in <br />OIigmal feasibility estimate). <br /> <br />4. An eight.foot wide walk is included in Bridge Option 2 vs. six.foot walk in Bridge <br />Option 1 for compaJison. <br /> <br />Sidewalk Option I: <br />. 6 Foot Concrete Sidewalk <br />. 2 Foot Edge Strip <br />Total Project Cost <br /> <br />:]; ,)'1,700 <br />5; 25.000 <br /><5 79,700 <br /> <br />OR <br /> <br />Sidewalk Option 2: <br />. 6 Foot Concrete Sidewalk <br />Total Project Cost <br /> <br />:]; ')4.700 <br />$ 54.700 <br /> <br />. <br /> <br />Sidewalk Option Note: <br /> <br />1. Preliminary discussion with MnDOT indicate that the sidewalk pOJ1ion of the project <br />would not score high for cooperative agreement funding however, state aid funds could <br />be used for these improvements. <br /> <br />Recommend Council Action <br />Staff requests that Council provide directiou on project scope and take 3ppropri3te action on the <br />attached Resolution 04-56. <br /> <br />In terms of the bridge, staff believes that this is a significant safety concern and major "choke <br />point" for the City. The bridge improvement is recommended. <br /> <br />Staff supports the concept of the sidewalk as a connecti on to an overall City trail system as <br />outlined in the Parks and Trails Master PIau. However, recognizing the intrusiveness into <br />existing residential yards, staff would recommend the le3st intrusive, yet viable option available. <br />Most likely this would be the option with a 2-foot set, back (colored p3vement or brick) with a 6- <br />foot sidewalk. Trail linkages 3nd pedestrian safety 3re the primary reasons for supporting the <br />sidewalk concept. <br /> <br />. <br />