Laserfiche WebLink
<br /> Contract Contract To Date <br />No_ MnDOT No_ Item Description Unit Unit Price Quantity Amount Quantity To Date Amount <br />CHANGE ORDER NO.1 - STORM DRAINAGE - <br /> COMMON CHANNEL EXCAVATION C' $1453 :;7800 $8,42/ 24 000 $0.00 <br />2 29"X1S"RC PIPE APRON EA $1,46('.00 {3.001 ($4.380.001 0,00 $0.00 <br />3 2S"Xl0" TRASH GUARD fA $506 (X) 1:200) [$1,012.00) 0.00 $000 <br />4 12" RC PIPE LF $34.00 (20000) ~$6.80000) 000 $0.00 <br /> 29"X10" RC ARCHPtPE LF $78.00 (11100) ($8,658.00) 000 $0.00 <br />2 10" HOPE PIPE SfWfR LF $1~)4 DO (230.00) ($35,42000) 000 $000 <br />3 3D" RC PIPE LF 56300 1;>800 $8.064.00 000 $O.CO <br />4 46" DRAINAGE STRUCTURE LF $2!,OOG (10.00) 1$2.500,00) 000 $0,00 <br /> flOATING SILT CURTAIN LF $l?OO (1Q()OO) ($1,20000) 000 $000 <br />2 UMESIONI:: ROCK WALl SF 524,00 (81.00) ($1,944001 000 $000 <br /> Schedule- E - Change- Orde-r No. 1 Storm Drainage Sublotat ($45,422.76) $0.00 <br /> <br />~HANGE ORDER NO.1 - WATEflMAIN <br /> <br />2 <br /> <br />REMOVE GATE VAlVE AND !:lOX EA $520.00 (3,001 ($1.560,00) 0,00 <br />Hl-:MOVE HYDRANT AND VALVE [^ $780.00 (7.00) ($5.460.00) 0,00 <br />F&IHYDRANT AND GATE VALVE EA $3,52000 (7.00i ($2<1.640,00) 000 <br />S"C-.ATE V,!,LVF;: AN080X - -$;.:GO,")() \.~.'-N; {$3.300.{Xl) 0.00 <br />Ir GATE VALVE AND BOX EA $1,660CXJ {2.00) ($J.32000) 000 <br />6" WATERMAIN DIP Cl52 IF $3140 (lS0.00j ($5,61000) 000 <br />8"WATERMAIN DIP CL52 LF $41.20 (700.001 ($8.:'.40(lO) 000 <br />HYDRANT EXTENSIONS L> $564.00 (f.(XJ) ($:3,38400) 000 <br />GATE VALVE EXTENSIONS LF $19000 (10.00) (SI.900.00i 000 <br />WATt'HMAINFmINGS LB $800 (44800) ($3,58400) 000 <br /> <br />3 <br /> <br />4 <br /> <br />2 <br /> <br />3 <br /> <br />4 <br /> <br />2 <br /> <br />$000 <br />$0.00 - <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$000 <br />'000 <br />$000 <br />$0.00 <br />$0.00 <br /> <br />SChedule- E ~ Change Order NO.1 Watermain Sublotal <br /> <br />($60,998_00) <br /> <br />SCHEDULE F - CHANGE ORDER NO. 2~ WATERMAIN <br /> <br />TEMPORARY WATER SYSTEM <br /> <br />$U.420.00 <br /> <br />!.S <br /> <br />$13,420(}() <br /> <br />1.00 <br /> <br />0.00 <br /> <br />$0.00 <br /> <br />Schedule F - Change Order NO.2" Walermarn Sublot.1I <br /> <br />$13,420.00 <br /> <br />CHANGE OAUER SUBTOTALS <br /> <br />($1C>5,27D.16) <br /> <br />GRAND TOTAL $1,703,314.16 <br /> <br />90110 <br /> <br />$Doo <br /> <br />,"00 <br /> <br />.- <br /> <br />$786,673.38 <br />