My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-08-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 05-08-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:31 PM
Creation date
11/15/2006 10:09:58 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />APi 2{ 2006 9:26AM <br /> <br />KRAUS A~DERSON LING <br /> <br />NO. 204 <br /> <br />PI/I <br /> <br /> <br />479 Apollo Drive, Lino Lakes, MN 55014' 763.792-3677 . Fax: 763.792.3678' www.krausanderson_com <br />An Equal Opponu~"ity Employer <br /> <br />April 24, 2006 <br /> <br />t:'f!t Kraus-Anderson. <br />IM:i.l SPECIAL PROJECTS <br /> <br />Mr. Dave Schemel <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />via fax: 651-634-5137 <br /> <br />RE: Warming Houses <br />Arden Hills Public Parks <br />Arden Hills, MN <br /> <br />Dear Mr. Scherbel: <br /> <br />In accordance with your request. we are pleased to prel$tnt the following bid to construct new warming <br />houses at your Arden Hills Public Parks. <br /> <br />The following scope of work includes alllabof7 materials, and equipment to construct (1) warming house at <br />(1) locations: <br /> <br />. <br /> <br />Excavation for gra yel base. <br />Import and placement of 6" of class five gravel base rock. <br />Rough lumber and sheathing, insulation, trusses, (2) \vindows, exterior door and <br />frame, soffits, asphalt shingles, and exterior pine paintable siding <br />Painting of exterior siding only. <br />New lOOamp sequeuce cabinet .and disconnect. <br />New 100amp overhead maSS and load center. <br />New 5kw electric unit heater with thermos.tat. <br />New incandescent lOOwattjeUy jar lights. <br />New switch and outlet. <br />Penrritsand insurance. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />TOTAL EACH: $19,679.00 <br /> <br />.Clarifications <br />1. We do not include power company hook-ups. <br />2. We do not include removal of existing warming houses. <br />3, We do not include painting of interioIs. <br />4. We have included treated lumber whete required, plywood interior walls and <br />ceilingl ins.ulation throughOut, and venting as required. <br />5. We Can provide material list if requested. <br /> <br />Please feet free to contact me upon YUlU review_ <br /> <br />v cry truly yours, <br /> <br />Kraus-Anderson., SPECIAL PROJECTS <br /> <br />/~L N~t <br /> <br />Justin J. Webster <br />Project Manager <br /> <br />JJWlkj <br />
The URL can be used to link to this page
Your browser does not support the video tag.