My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-15-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 05-15-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:33 PM
Creation date
11/15/2006 10:10:06 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br />~~HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />Agenda Item 3.C. <br /> <br />May 9, 2006 <br /> <br />TO: <br /> <br />Honorable Mayor and City Council Members <br />Michelle Wolfe, City Administrator <br /> <br />Schawn Johnson, Assistant to the City Administrator sr<S <br />Jim Perron, Operations and Maintenance Superintendent <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />City Council Approval of a Replacement Pump for Lift Station #3 <br /> <br />ENCLOSURES: <br /> <br />Braun Pump & Controls Bid Proposals <br /> <br />Overview <br />On May 2nd, members of the Operations and Maintenance Department noticed that the pump at <br />lift station number three was not operating properly, Members of the Operations and <br />Maintenance Department contacted Braun Pump & Controls for a service call to investigate the <br />situation, Braun Pumps & Controls conducted a performance test on the existing pump and <br />reported that the propeller and shaft were damaged, The proposed replacement parts and labor <br />costs would exceed the monetary value of purchasing a new pwnp. At this time, members of the <br />Operations & Maintenance Department have borrowed a pump from Braun Pump & Controls to <br />ensure that lift station number three is operating efficiently, <br /> <br />Backl!found <br />The existing pump at lift station number three was originally installed in 1998 when the lift <br />station was rebuilt. City staff is proposing the purchase of an ABS Pump Model AFP I 049,5, <br />The proposed ABS pump has a 10 horse power engine and a 5 year non-prorated warranty, <br /> <br />Recommendation- <br />City staff recommends the purchase of one (1) ABS Pump Model AFPI049,5 for the purchase <br />cost of $6,500 (including the estimated cost for sales tax and freight charges), City staff would <br />install the new pump at lift station three, <br />
The URL can be used to link to this page
Your browser does not support the video tag.