Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />ICON Budget Plan Process <br /> <br />Collect Information Dn Sections Selected for Analysis Budget Analysis Input Parameters <br />Pavement Surface Type Clfrom latest Surveyor Latest Project: Analysis Period (years) Plan start Year <br />Functional Class HistoriCal Global Strategies App~ed inflatiOn Rate (%) Annual8udget Allocation Quant~ies <br />Sn (Calc:ukrted structural Number) if available Buclgel: Overflow Priorlies Predetermined Project Plan if available <br /> <br />Try AU Possible and <br />Applicablestralegies <br />Based On <br />Ufe Cycle Cost (leG) <br /> <br />Add 10 <br />Annual Ust <br />of Recommended <br />Projects <br /> <br />Ccp(llgltlO:nDGoo:lI'OIII!Ttcl.Dtg'{COIpOr.IlIClj <br /> <br />Decay Condition Index (el) <br />to Ye6r of Budget Analysis Pbn <br /> <br />Yes <br /> <br /> <br />No <br /> <br /> <br />y" <br /> <br /> <br />For Eoc.h MaintenMce Cme!:1Jry, Sort Priority By <br /> <br />1) Condition Index (a) <br />2) Functional Class <br />3) structural Number (SrI) <br /> <br />y, <br /> <br /> <br />Add 10 <br />Annual <br />BacklolJ <br />List <br /> <br />No <br /> <br />Figure 3 <br /> <br />The program did not sort pavements on the basis of structural information <br />(nondestructive deflection testing) in the budget analysis of this report, since this testing <br />was not included in the scope of work for this project. <br />