Laserfiche WebLink
<br />Renair existine buildin!!s <br />Recommended Repairs: <br /> <br />Optional Add On: <br /> <br />Bring in mobile units <br /> <br />Build a small portable <br />building. <br /> <br />Construct New Buildine:s: <br /> <br />UFF sheds <br /> <br />Similar structure <br /> <br />l\:Jove existing warming <br />house buildiugs. <br /> <br />Tear down building and <br />don't replace <br /> <br />Warmiu2 House Options <br /> <br />Hazelnut <br /> <br />$1,691.00 repair costs <br /> <br />Optional add on: choice I: <br />Cedar siding - not primed = <br />$571.60 <br /> <br />Optional add on: choice II: <br />Cedar siding - prc-primed = <br />$469.60 <br />$1,349,10 per year <br /> <br />One time cost of <br />electrical: $1,600 <br /> <br />*Does not include tear dovm costs- <br />including dumpster fee of $285. <br /> <br />One time build out fee: <br />$5,000 <br /> <br />*Does not include tear down costs- <br />including dumpster fee of $285. <br />*Docs not include electrical hook up <br />costs. <br /> <br />TIJFF Shed price will vary as <br />low as $1,295 to $9,781 <br />depending on type and size, <br /> <br />*Price does not include construction <br />adjustments that need 10 be added, <br />such as: ceiling installation, <br />insulation added throughout building, <br />interior paneling added, electrical <br />installed, a heater would need to be <br />added and hooked Up. <br /> <br />$19,679,00 <br /> <br />*Price does not include electrical <br />hook-ups, removal of existing <br />sLructures, or painting of interior. <br /> <br />$4,000 moving fee <br /> <br />$2,496 for concrete pad <br /> <br />*Price does not include existing <br />building tear down, post removal and <br />rcstoration, gate removal and <br />restoration, necessary tree trimming. <br />or electrical hook up. <br /> <br />N/A <br /> <br />Freeway <br /> <br />$1,103,00 repair eosls <br /> <br />Valentine <br /> <br />Optional add ou: choice I: <br />Cedar siding not primed = <br />$469,60 NI A <br /> <br />Optional add on: choice II: <br />Cedar siding pre-primed = <br />$469.60 <br />$1,349,10 per year $1,349.10 per year <br /> <br />One time cost of electrical: <br />$3,825 <br /> <br />"'Does not include lear do\vn costs - <br />including dumpster fee of $285 <br /> <br />One time build out fee: <br />$5,000 <br /> <br />"'Does not include tear down costs <br />including dumpster fee of$285. <br />*Does not include electrical hook up <br />costs. <br /> <br />TUFF Shed price will vary as <br />low as $1,295 to $9,781 <br />depending on type and size. <br /> <br />"'Price does nOI inc1vdc cOflstn.lc!ion <br />adjustments that need to be added, <br />such as: ceiling installation, <br />insulation ndded throughout <br />building, interior paneling added, <br />electrical installed, a heaterwoutd <br />need to be added and hooked up. <br /> <br />$19,679,00 <br /> <br />*Price does not include electrical <br />hook-ups, removal of existing <br />structures, or painting ofintcrior. <br /> <br />$4,000 moving fee <br /> <br />$2,496 for concrete pad <br /> <br />*Price does not include existing <br />building lear do......n, post removal <br />and restoration, gate removal and <br />restoration, necessary tree trimmmg, <br />or e1ectricnl hoo~_ up. <br /> <br />N/A <br /> <br />One time cost of electrical: <br />$1,423 <br /> <br />"'Does not include tear do\VIl cosL<;- <br />including dumpster fee of $285. <br /> <br />One time build out fee: <br />$5,000 <br /> <br />"'Does nol include tear dov.'Tl costs- <br />including dumpster fee of $285. <br />*Does nOl include electrical hook up <br />cosls_ <br /> <br />N/A <br /> <br />N/A <br /> <br />Savings of$2,656,29 per <br />season for staffing. <br /> <br />~etro-inel.us\ArdenHil1S\PR&PW\Recreation II CERINKSI Warming House Options Grid06.doc <br />