My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-19-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 06-19-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:37 PM
Creation date
11/15/2006 10:10:26 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT: New Siding for Freeway and Hazelnut Buildings <br /> <br />. <br /> <br /> <br />-. <br />Estimated Cost: <br /> <br />$499.60 or $397.60 <br /> <br />Option I: Cedar tongue and groove siding (not primed) <br />$24.99 per sheet (4'x 8') <br />20 sheets x $24.99 = $499.60 <br /> <br />Option 2: Smartside tongue and groove siding (pre-primed) <br />$19.88 per sheet (4'x 8') <br />20 sheets x $19.88 = $397.60 <br /> <br /> <br />$40.00 <br /> <br />The cost of each piece of 1 "x3"x8' corner trim is $5.00. <br />Each building will require 8 pieces. <br />8 pieces x $5.00 = $40.00 <br /> <br />. <br /> <br /> <br />Estimated Cost: <br /> <br />$12.00 <br /> <br />The cost of each 10' section s of divider drip rail is $4.00. <br />Each building will require 3 sections. <br />3 sections x $4.00 = $12.00 <br /> <br /> <br />Estimated Cost: <br /> <br />$20,00 <br /> <br />The cost of these materials is $20.00 <br /> <br />Estimated Total Cost for Option I: $571.60 <br /> <br />. <br /> <br />Estimated Total Cost for Option 2: $469.60 <br /> <br /> <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.