Laserfiche WebLink
<br />:Freeway and Hazelnut Warming House Repair Estimates <br /> <br />FREEWAY <br />~ 0 tion 2 Estimate* <br /> <br />. <br /> <br />Roofing Materials: <br />Shingles <br />Rolled Felt <br />Nails <br /> <br />Total <br />_ Soffit, Fascia al1c1 Tflm <br />Insulation <br />Attic Odor Sealer <br />Caulking Bricks <br />Ceiling Material: <br />1/2 Inch <br />3/8 Inch <br />Flooring Material: <br />314 Inch Treated <br />Yo, Inch CDX Plywood <br /> <br />5110,00 <br />$30.00 <br />$6,00 <br />$146.00 <br />$618.00 <br />. J <br />$185.00 <br />$4000 <br />.. ~_----,$300~ __ <br /> <br />$J 46.00 <br />$6J8.00 <br />$J 85.00 <br />$40.00 <br />_._--~ <br />$30.00 <br /> <br />$J46.00 <br />~~ <br />$6J8.00 <br />$J 85.00 <br />$40.00 <br />$30.00 <br /> <br />$228.00 <br />$19200 <br /> <br />$228.00 <br /> <br />$J 92.00 <br /> <br />- <br />Paint <br />~.. <br /> <br />$444,00 <br />$145.00 <br />50.00 <br /> <br />Total <br /> <br />$444.00 <br />$50.00 <br />$J,741.00 <br /> <br />$J45.00 <br />$50.00 <br />-- <br />Total $1,406.00 <br /> <br /> <br />. <br /> <br />Roofing Materials: <br />Shingles <br />Rolled Felt <br />Nails <br />Total <br />Siding (east side only): <br />3/S 4xS Tongue and <br />Grooved Primed <br />Insulation <br />Ceiling Material: <br />1/2 Inch <br />3/8 Inch <br />--"-- <br />Flooring Material: <br />% Inch Treated <br />1'2 Inch CDX Plywood <br />Paint <br /> <br />$110.00 <br />$30.00 <br />$6,00 <br />.~- <br />$J46.00 <br /> <br />, <br /> <br /> <br />~l"'O~ _~ <br /> <br />$146.00 <br /> <br />$100.00 <br />$185,00 <br /> <br />$J 00.00 <br />$185.00 <br /> <br />$100.00 <br />$IS5.00 <br /> <br />5228,00 <br />$192.00 <br /> <br />Total <br /> <br />$22S.00 I' ~ - - $J 92.0.0 <br /> <br /> <br />$444.00 $145.00 <br />$50.00_1 $50.00 <br />$1,153.00 --.l.}'otal_ $818.00 <br /> <br />t- <br />n______. <br /> <br />$444,00 <br />$145,00 <br />50,00 <br /> <br />A dumpster rollolTwould be needed if the buildings wer'e to be removed. The cost is <br />$2S5.00 for a 20 yard dumpster. A dumpster wonld be needed at each building site. <br /> <br />. <br /> <br />* The estimates do not inclnde the cost of labor. <br /> <br />\\!\l('tr-o-illt'LII~\.A.rd{'nHilh\PH& P\\\J>arb\FI'{'('way and Hazduut \\'armin~ lIoust' Repair Eslimale 03~06.doc <br />