My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-19-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 06-19-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:37 PM
Creation date
11/15/2006 10:10:26 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />APR,24 2006 9 26AM <br /> <br />KRAUS ANDERSON lINO <br /> <br />NO, 284 <br /> <br />P. 1./1 <br /> <br /> <br />79 Apollo Drive, Lino Lakes, MN 55014 . 763.792,3677 . !'ax: /63,792.3678 . www.krausanderson.com <br />An Equal Opponulliry Employer <br /> <br />Apnl 24, 2006 <br /> <br />~ Kraus-Anderson. <br />IMl1 SPECIAL PROJECTS <br /> <br />Mr. Dave Scherbel <br />City of Arden Hills <br />1245 West Highway 96 <br />Men Hills, MN 55112 <br /> <br />via fax: 651-634-5137 <br /> <br />RE: Warming Houses <br />Arden Hills Pnblic Parks <br />Arden Hills, MN <br /> <br />DeIlr Mr. Scherbel: <br /> <br />Iu accordance with your request, we are pleased to preserlt the following bid to construct new warming <br />houses at your Arden Hills Pnblic Parks. <br /> <br />The following scope: of work includes alllaborT mate-rials, and equipment to construct (1) wanning house at <br />(I) locations: <br /> <br />. Excavation for gravel base. <br />. Import and placement of 6" of class five gravel base rock. <br />Rough lumber and she:'l.thing, insulation, trusses, (2) windowsl exterior door and <br />frame, soffits, asphalt shingles, and exterior pine paintab1c siding_ <br />Painting of extl':rior siding only. <br />. New l00amp sequence cabinet and disconnect. <br />~ New lOOamp overhead maSS and load center. <br />New 5kw electric unit heater with thermostat. <br />. New incandescent 1000attjeUy Jar lights. <br />. New switch and outlet. <br />~ Pennitsand insurance. <br /> <br />TOTAL EACH: $19,679.00 <br /> <br />Clarifications <br />1. We do not include power company hook-ups, <br />2. We do not include removal of existing warming hou.ses. <br />3. We do not include painting of interiors. <br />4. We have included treated lumber where xequired, plywood interior walls and <br />ceiliug, insulation throughOut, and venting as required. <br />5. We Can provide matetiallist if requested. <br /> <br />Please feel free to contact me upon your re...;ew. <br /> <br />Very tmly yours, <br /> <br />Kraus-Anderson., SPECIAL PROJECTS <br /> <br />/0A1 i- tviLk, <br /> <br />Justin 1. Webster <br />Project Manager <br /> <br />JJW/kj <br />
The URL can be used to link to this page
Your browser does not support the video tag.