<br />Attachment to Change Order No.2 <br /> <br />. <br /> <br />Owner: <br />Contractor: <br />Project: <br /> <br />City of Arden Hills <br />Arnt Construdion Company, Ine. <br />2006 Pavement Management Program <br /> <br />Description of changes: <br />The following is an overview of the modifications proposed to the contract with regard to a temporary water systcrn. The <br />original contract specifications identified a maximum 8 hour time period for water shut down for any construction purposes <br />throughout the neighborhood. While that is still believed to be feasible the Contractor feds that it would require extra loss <br />of trees and landscaping in the area of Siems Court, south of Arden Pbce. Also, Xed.Gas has identified this same area for <br />gas main reconstruction/relocation because of the existing pipe material, it's condition, and its proximity to proposed water <br />and storrn sewer. In order to limit the damage to extra trees and landscaping and to provide Xed-Gas time 10 replace gas <br />main in the area a temporary water system will be utilized. The temporary waler system will ensure that all residents on <br />Siems Court will have waler throughout the dnration of the storm sewer and private utility construction. <br /> <br />Schedule C - Watermain <br />The proposed work is outlined below: <br /> <br />I. Temporary \Vater System <br />Snbtotal Schedule C - \Vatermain <br /> <br />] Each @ <br /> <br />I.ump Sum <br /> <br />$15,000 <br /> <br />~. 15.000.00 <br />$ 15,000.00 <br /> <br />. <br /> <br />CHANGE ORDER SUMMARY <br /> <br />Schednle C - \Vatermain <br /> <br />$ 15,000.00 <br /> <br />Total Contract Modification for Change Ordcr No.2 <br /> <br />$ 15,000.00 <br /> <br />End of Change Order No.2 <br /> <br />. <br />