My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-31-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 07-31-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:41 PM
Creation date
11/15/2006 10:10:41 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br />EN HILLS <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />Agenda Item: SA <br /> <br />July 27, 2006 <br /> <br />TO: Michclle Wolfe - City Administrator <br />Honorable Mayor and City Council <br /> <br />FROM: Michelle Olson, Recreation Program Supervisor 'jT!(i) <br /> <br />SUBJECT: Warming House Replacement Plan <br /> <br />BACKGROUND <br />At the May 8, 2006 Regular City Council Meeting, a warming house comprehensive report was <br />presented. The City Council tabled the item to the June 19, 2006 Work Session for further <br />discussion. At that time, staff was directed to bring the report back with additional information. <br />At the Work Session, the City Council reviewed the report and showed support for a <br />combination of two options, Based on those discussions, staff has put together a proposed <br />replacement plan. <br /> <br />September 2006 <br />Move existing wanning house building (20 x 28 ft,) from Valentine Park to Freeway <br />Park. Hazelnut will be utilized as is for the 2006/2007 and the building condition will be <br />evaluated after the ice rink season. <br /> <br />Costs and Steps Involved: <br /> <br />. Tear down existing building at Freeway Park. This will be done by the 0 & M <br />Department. Tear Down: A one time fee of$285 for 20 yard dumpster. <br /> <br />· Lay a 20 x 28 Concrete Slab at Freeway Park. Norsk Concrete gave a eost <br />estimate of$2,800, <br /> <br />· Move existing wanning house from Valentine Park to Frecway Park. Semple <br />Movers gave a cost estimate of$4,000. <br /> <br />. Disconnect/Hook-up electrical from the building at Valentine Park before and <br />after thc move to Freeway Park. We received an estimate from Peoplcs Electl;c <br />for the electrical disconnect/ hookup for approximately $] ,650. <br /> <br />The total estimated cost estimate for the above option is $8,735 <br />
The URL can be used to link to this page
Your browser does not support the video tag.