Laserfiche WebLink
<br />ARDEN HILLS PLANNING COMMISSION -OCTOBER 4, 2006 <br /> <br />3 <br /> <br />Commissioner Sand asked if the curb cuts were being put in where the westerly driveway . <br />was located. Me Lis responded they had not bccn put in yet. <br /> <br />Chair Sand asked when the home was completed, Me Lis responded it was completed in <br />the fall of 2003, He stated they did the entire driveway at the same time and at the time, <br />they did not know they could not have two curb cuts. Hc stated they did not "sneak" in <br />the second driveway, <br /> <br />Commissioner Larson asked when they moved in, was all of the grading done, Me Lis <br />responded everything was done, except the sod had not been put in, <br /> <br />Commissioner Zimmerman asked in the plans that were submitted to the City, was it a <br />single or dual access driveway, Me Lis responded a single assess driveway was shown, <br /> <br />Commissioner Larson asked if the cmshed rock was on the plans as submitted, Me Lis <br />responded it was. <br /> <br />Chair Sand invited anyone for or against the request to come forward and make <br />comment. <br /> <br />Bill Thornton, 3510 Siems Court, stated he supported these variances, He noted the <br />neighhorhood was not a "cookie cutter" or new development and it was an eclectic <br />neighborhood, He indicated the housing types, lot shapes, etc. were all different He . <br />noted right across from this gravel driveway was another gravel driveway which had <br />heen there for many years, He statcd there were also other circular driveways with two <br />accesses in the neighborhood, He stated there were also people who had turn around, as <br />well as driveways that were three cars wide, He noted there was no conformity in that <br />neighborhood now because it was not that kind of neighborhood and they did not want it <br />to be that kind of a neighborhood, He believed the crushed stone and the dual access <br />driveway fit into the neighborhood, He stated with respect to the hardship issue, thcy <br />were undergoing major, major constmction - they had lost a lot of trees - and the <br />hardship was for the entire neighborhood, He stated if applicant eould not have a decent <br />size driveway he was coneerned that the two trees would need to be cut down. He noted <br />the two trees could also represent a rain garden for the City. He stated the neighborhood <br />did not want to see those trees go and they would prefer to see a rain garden in this area, <br />Ile believed the City needed to live by some of the uniqueness ofthc neighborhoods. He <br />asked the City to approve both variances. <br /> <br />Chair Sand closed the publie hearing at 7:25 p.m, <br /> <br />Commissioner Larson asked Building Official Scherbel for the timeline. Mr, Scherbel <br />reviewed the memorandum submitted, He noted there were still some building related <br />issues that remained on this home, He indicated the permit was for a single access <br />drivcway and staff was unsure of the time table for when the current driveway <br />configuration was installed. <br /> <br />. <br /> <br />Commissioner Modesette asked when thc trap rock was put in. Me Lis responded it was <br />installed on September 4 and 5, 2003, <br />