Laserfiche WebLink
� <br />�] <br />39 <br />� <br />without a clean out. That's to protect you against a chtap job <br />to start with and a lot of trouble afterwhile. V�hen you g�t to <br />going around the house and building these curves and clean outs <br />and the digging and a lot of pipe. perhaps it's cheaper to qo right <br />through the basem�nt, and that would be as Mr. Pcpovich pointed <br />out� the individual connection is entirely up to the�property owner <br />on his indivfdual contract with the man that's going to do the work <br />and I expect he will go into the details at that time and see <br />which is going to be the cheaper. So far my information has been <br />that there are many situations when it's actually cheaper to go <br />back through the basement floor than the curvas and clean outa. <br />MAYOR ASHBACH: Any other questions or Gommfnts? <br />� <br />hR. J. TIMM, 1400 Cu�nings: I don't know if I w�nt on <br />record but at this time I would like to say I am in favor of the <br />proposed project. <br />NQ�. L. B, STEVENSON� 3461 Siems Court: I would like to know <br />at what approximate date ws could expect the sewers to be installed. <br />b�t. BANISrFFi: To answer your yuestion, that, of course. is a <br />� <br />tough one and some of it is going to depend a little bit on procedure <br />of the Council. They have to take a position before construttion <br />could be underway. 7he plans and specificatio�s would have to be <br />completed. It is possible that part of the area might have s4rvice <br />in the year of 196C. I would hesitate to promise service for <br />196C. I think some of tha area could get it but it's questionable <br />as to whether all of 1t could. The Council has within six months <br />of this date to order the improvement in and if the Council <br />waited 6 manths before ordering it in then plans and specifications <br />being prepared after that� there would be no construction in 196C. <br />