My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 01-09-1961 (2)
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1960-1969
>
1961
>
CC 01-09-1961 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:26:34 AM
Creation date
11/27/2006 9:31:56 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�' <br />MINUTES OF REGULAR t+fEETING <br />Council of the Village of Arden Hills <br />• Monday, Januarg 9, 1961 <br />The meeting was called to order at 8;10 p.m. by Mayor Ashbach. <br />RO�,I, CALL: Present - Ashbach, Kennedy, Stromquist <br />Absent - Crepeau <br />Also Attending - blr. Peterson, Mr. Lund from Eannister <br />�ngineering and Donald Carley, Village Engineer <br />�NNISTER ENGIN�ERING CO - Mr, Peterson reported on the problem the <br />swamp east o the ift station on the north side of the R.R. tracks <br />serving Valentine Hills, etc. is presenting. It has no bottom, <br />necessitating the use of p31in and pipe of extra strength. Cost for <br />the additional piling wi11 be �4,000.00 extra and estimated cost of <br />stronger pipe will be �7.70 per foo.t for approximately the 165� neceasary <br />to use. <br />?�e also gave progress report on other sections of the sewer project. <br />VILLAGE ENGINEER'S REPORT -?vIr. Don Carley reported on the Jurgenson <br />matter. h4r. Jurgenson, eveloper of Josephine Hills #3 has a bond in <br />with the Village assuring completion of roads when the serrers are in. <br />A sum of �1,498.00 for surfacing and a sum of �182.00 for grading and <br />cleanup work has been paid to the village by Mr. Jurgepson. <br />• P�4r. Carley recommended that these sums be accepted by the Village as <br />final settlement for the street. <br />Kennedy moved and Ashbach seconded acceptance of Village �p�ineer's <br />recommendation to accept checks of i�2r. Jurgenson as final settlement and <br />Clerk is to release his bond. Carried. The Village Clerk is to deposit <br />these checks in a specisl fund. <br />Mayor Ashbach reported that Mr. Stan Olmen has accepted council appoint- <br />ment to fill Mr. Dick Jones unexpired term on the Villa�e Council. His <br />resignation as a member of the School Board of District 621 has been <br />tendered. He will be installed at the next regular council meeting of <br />the Village of Arden Hil].s. <br />�r. Kennedy moved,Nlre. Stromquist seconded a motion that Bannister <br />Engineeriqg �o, proeure property listings and proceed with Assessment <br />role on Improyements #2, 3, and 4 in time to hold assessment hearings <br />early in the summer. Carried. <br />CLERK'S REPORT - The Roseville Engineer called last Friday to report <br />ha e ine from Ftoseville is all set for operation. Mrs. Stromquist <br />moved, Kennedy seconded approval of payment of check for �115,000.00 to <br />Roseville. Carried. <br />__,�.� <br />Nre. Stromquist moved, Kennedy seconded approval of payment of c].aim <br />• �2645 for a sum of �1Fi4.00 out of the 1960 budget as this sum represents <br />deductions made for last three �onths of year. Carried. <br />\ <br />� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.