Laserfiche WebLink
� <br />• <br />• <br />• <br />• <br />. <br />` J <br />«- <br />� <br />MRNUTES OF REGULAR COUNCIL ME,L7VNG July 31, 1978 <br />Page Two <br />asked for his recommendations �alative to general drainage in the <br />area. <br />Briarknoll - F6na! Plat <br />Christoffersen report�d that he has not reviewed the Plat In <br />detaii; received the estimate today of the first phase construct(on <br />t$238,052.00) ►+hlch does not inc6ude the watermaln on Colleen Avenae, <br />which w(il be done by the Clty; not ready to recommend a bond <br />amount, but feels the $4,600/!ot estiroate is probaEty adequate; <br />asked if there witi be a Oevelopmen4 Agreement; suggested approval <br />of the plat with the contingency of the E�gineer's approvai; no <br />maJor problems are foresean. <br />Frances Hagen, Westwood Planning and Englneering, reported that <br />the estimate is based on the thTrd highest bid; presented a <br />revised"Fina� Plat which has a mTnor adjustment requested by the <br />Count.y Highway Depar#ment. <br />Duane Dietrich said he feels it is essential to have a Development <br />Agreement. <br />, <br />Wingert moved, seconded by Crechton, that Council approve the Finaf <br />Plat of Briarknofi phase f, as submitted (received 7-31-78); <br />contingent upon execution ot the Development Agreement, to be <br />prepared by the Ci ty Atfiorney cover�h� n�t u-/.i.s�eG! �� <br />Briarknoll phase I improvements. � <br />�i . <br />�� <br />(It was noted that the Developmea�t Agreement will contain the <br />bond amount and epproval of the plans and specifications by the <br />City Engineer; park dedication determination will-be resoive6 for <br />the entire Briarkooil developmenf (phase i an.d 2); whan phase <br />2 1 s approved. ) <br />Report on Vaientine Lake Yfew No. 3 <br />Christofifersen referred Councfl to report of subsurface exploration <br />of the proposed Gale Circle extension (�-19-78); anficlpates that <br />road w�l1 unlformly settle, but not an appreciable amount; proposes <br />2" b3tuminous rith an overtay probabiy at the time road is <br />scheduleC for sgal coating (w(ii revTea at that timel. <br />Lift Statlon No. 5 <br />Christoftersen was requesi�ed to advise Cou�cil tt llghtning arrestor <br />shouid be instaPlBd a4 lift station No. 5. <br />OTHER BUSINESS <br />Arden Manor � R�auest for T1me Extension for Completion <br />ran� cis Husnik referred Councif fio the Progress Report prepared <br />by Building ansp�ctor Squires (7-31-78) and reported the followirtg: <br />!. 7he pool is nowr close to c.ompletlon; working'on the finisA <br />coat today and hope to have (t completed by the end of the <br />week; expects �ence to be installed on Wednesday. <br />2. Most of the remalning sodding is on about 40-45 partial <br />lots; f(li dtrt has besn spread, letfier from contractor <br />sirates that sodding �viii be complated by September 30�h. <br />3. Expects delivery of equipment for tot lots by Sepi�ember ist. <br />4. .Prefers spring planting; esked that Councfi gra�t an extension <br />unt31 June 30th of 1979 for completion of the plantings; <br />has placed ord�r for trees. <br />5. Explained he is working wEth NSP to resolve the strset <br />light system. <br />Aft9r discussion, Wing�rt moved, s�conded by Woodburn, that Councll <br />extand the date tor compietion of a11 work at Arden Manor, except <br />the landscapfng, unt(I 5eptember 30, f978, at which time, )t alr <br />it�ms are compie�ed, extenston tor landscap� compiatEon will be <br />reviewed. MotFon carrfad unanimously. <br />- 2 - <br />