Laserfiche WebLink
� � <br />SUGGESTED LETTER l�t�i VI'Li.AGE OP ARDEN HILLS <br />Village Council <br />Village of Roseville <br />2701 North Lexington Avenue <br />St. Paul 13, Minnesota <br />�� <br />� 3 <br />�, b� � <br />� <br />Gentlemen: <br />Recent developments within the Village of Arden Hills have made it appear practical <br />and timely that the Village consider immediately the necessary steps which might lead to <br />•the construction of a partial water system for the easterly portion of the Village. As <br />you are undoubtedly aware, Control Data Corporation is now constructing the first build- <br />ing of their industrial plant. Control DatA must be provided water for fire fighting <br />in the form of overhead storage prior to the opening of their plant which is established <br />as late in 1963. If this is to be municipally supplied water, our council must act with- <br />out delay. <br />Accordingly,the Village of Arden Sills is contemplating theroviderthesenfacilitiesnwhich <br />facilities by the Village rather than having Control Data p <br />probably would not readily integrate into an eventual municipal system. Further�thei�i� <br />wi11 6e other needs for a municipal water system, particularly iror fire protection, by <br />other large users following in the very near future. <br />`.,,.,, For the foregoing reasons, the Village of Arden Hillspin considering sources of water, <br />/+�+? §eae arrived at the conclusion that they have two possibilities with an alternative third <br />available to them. 1he first source, of course, would be to conatiucf Te�eWVillageth A <br />necessary pumping equipment and utilize these for a source of �ugp Y <br />second possibiiity is that the Village of &oseville would provide water to Arden Hills <br />from the City of St. Paul. Our engineers, Banister Bngineering Company, adviae that this <br />has been considered in the past by Roseville in planning its system. We further recognize <br />that in negotiations with the City of St. Paul in 1962, that the needs of a portion of <br />Arden Hills were considered in the preparation and ultimate conclusion in the matter of <br />a contract between Roseville and St. Paul. A third alternative possibility would be for <br />the Village of Arden Hills to construct deep wells for utilization for a short period, <br />followed hy an ultimate connection with the Village of Roseville, with the deep wells <br />to then be abandoned. <br />Taking in account the above matters and the urgency of taking steps to provide water to <br />Control Data, if the Village is to do so, we are desirous that the following questions <br />he answered at the earliest possible date by your Council so that we may reach a desision <br />as to which procedure we might follow. <br />1 <br />2. <br />� <br />The date at which water would be available to Arden Hills at approximately <br />the intersection of Glen Hill Road (County Road D) and Hamline Avenue. <br />The cost to Arden Hills for the enlargement of Roseville mains necessary to <br />convey water to the above point and the basis upan which such costs would Ue <br />calculated. The location of these mains is also of interest. <br />-1- <br />